Skip to content
Back to search

Poland – Construction work – Budowa stacji 400 kV Krzemienica – etap I

Polskie Sieci Elektroenergetyczne Spółka AkcyjnaPolandPublished on Oct 04, 2026
20 days left

Description

1. The subject of the Contract is the comprehensive construction of the new 400 kV SE Krzemienica substation with an access road, expansion of the water supply network outside the substation boundaries and related infrastructure, as well as the construction of a double-circuit 400 kV line Krzemienica – Słupsk – Żydowo Kierzkowo section, including the introduction of optical fibre routes to SE Krzemienica, and the commissioning of the 400 kV relations Krzemienica – Słupsk 2 and Krzemienica – Żydowo Kierzkowo. 2. A detailed description of the subject of the Contract, including with regard to the Supervision Option and Options 1-4, is contained in Part II SWZ Functional-User Program and in Part IV SWZ. 3. Names and codes of the Common Procurement Vocabulary: 45000000-7; 35100000-5; 45100000-8; 45200000-9; 45300000-0; 45500000-2; 71200000-0; 71300000-1; 71400000-2; 71500000-3 4. In all cases where the Contracting Authority, by referring to standards, technical assessments, technical specifications and technical reference systems, as mentioned in Article 101(1)(2) and (3) of the Act, describes the subject of the Contract, the Contracting Authority admits equivalent solutions described, if they allow to obtain features or parameters not worse than those referred to. The above means that the Contractor may apply solutions described by the Contracting Authority "or equivalent". 5. The Contractor who refers to equivalent solutions described by the Contracting Authority is obliged to prove that the supplies, services or construction works offered by him meet the requirements specified by the Contracting Authority to an equivalent extent. The condition for the application of equivalent solutions is their written approval by the Contracting Authority. Differences between the invoked standards and their equivalents must be precisely described by the Contractor and submitted to the Contracting Authority – during the implementation of the subject of the Contract – for approval.

CPV codes

Construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders