France – Construction work for engineering works except bridges, tunnels, shafts and subways – Marché de travaux de Génie-Civil et VRD terrassements pour la création d'une chaufferie biomasse à Cognin pour le réseau de chaleur urbain R3C
Description
The present contract comprises the design, construction of civil engineering works, foundations, earthworks and VRD (Roads and Diverse Networks), carpentry, waterproofing, roofing, and the optional supply of a weighbridge. The works also include second fix, notably joinery and locksmithing for an office area. The main works and buildings to be constructed as part of this operation are a biomass boiler with storage silo for the heat network operated by R3C. For information, the financial volume of the works would be distributed according to the following assumptions: MAIN WORKS: 80%; VRD/EARTHWORKS: 20%. Annex: The indicative building permit file is available on the buyer profile.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Wall-covering work – Accord-cadre à bons de commande pour des travaux d'entretien courant de Peinture Revêtements Muraux et Revêtements de sols
OPH de la Haute-SaôneFranceWall-covering workFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Installation of road lighting equipment – Travaux de Génie Electrique sur le territoire de Grand Besançon Métropole
Grand Besançon MétropoleFranceInstallation of road lighting equipmentInstallation of outdoor illumination equipmentDeadline in 33 daysPublished on Sep 08, 2026
France – Wall-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de peinture et revêtements muraux
OPH de la Haute-SaôneFranceWall-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Floor-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de revêtements de sols
OPH de la Haute-SaôneFranceFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026