Skip to content
Back to search
This tender has expired.

Germany – Engineering services – Ortsgemeinde Kinderbeuern - Kindertagesstätte "Zauberwald" Kinderbeuern: Anbau, Umbau- und Sanierungsmaßnahmen, Los 2: Technische Ausrüstung HLS und Elektro

Ortsgemeinde KinderbeuernGermanyPublished on Jul 23, 2026
No deadline given

Description

The contracting authority and client, the municipality of Kinderbeuern, Kondelstraße 24a, 54538 Kinderbeuern, intends to expand the existing two-group day-care centre "Zauberwald" in Kinderbeuern into a three-group facility based on the Kita-Zukunftsgesetz. The planned expansion includes a nest group for children under three years of age, as well as two regular groups with a total capacity of 54 children. The current facility, with a maximum of 32 places, does not meet the demand. Phases 1-4 of the project have already been completed. Due to the projected decline in the number of children in the municipality, the needs assessment had to be reviewed by the municipality and the Youth Office, which is why the awarding of phases 5-9 HOAI was temporarily postponed. In the meantime, the decision has been made to continue the construction project based on the existing planning, so that the awarding of phases 5-9 HOAI can proceed. The project comprises two extension areas as well as extensive renovation and refurbishment work in the existing structure:

- Larger extension with U3 group room, sleep room, changing room, storage room, corridor with cloakrooms, disabled WC, staff WC, staff room and storage room;

- Second extension with technical room, WC/changing room for the domestic helper, as well as new kitchen with dishwashing area, antechamber and store;

- Alteration of the entrance area/vestibule;

- Renovation and refurbishment of the washroom;

- Renovation and refurbishment work in the existing structure: construction of a boot corridor at the side entrance, demolition of internal and partition walls to create ancillary and bistro areas, renewal of floor coverings, installation of new acoustic ceilings, energy efficiency measures (ceilings, facade, floor) and barrier-free access;

- Overhaul and reconstruction of the outdoor facilities and access paths, as well as supplementation of fencing and gates, where necessary.

During the implementation, the ongoing day-care centre operation will take place in a temporary location. The planning should be carried out promptly after the order has been placed. The implementation of the project is planned to be completed by the end of 2028.

CPV codes

Engineering servicesHeating-system design servicesVentilation consultancy servicesElectrical servicesEngineering design services for mechanical and electrical installations for buildings

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders