Germany – Engineering design services – BIM-Planung VST Binolen (Ersatz Bstg.), VA/50Hz/LST/KIB; Lph 1-4, opt. 5-7, NRW

DB InfraGO AG – Geschäftsbereich Personenbahnhöfe (Bukr 11)GermanyPublished on Oct 12, 2026
No deadline given

Description

Project Outline Traffic Station: The following measures are to be implemented at the Binolen traffic station as per the ZKB-Layout-Standard by the present project:

- Replacement of the external platform at track 2 with a usable length of 120 m and a height above the rail level of 76 cm.

- Replacement of the intermediate platform at track 3 with a usable length of 120 m and a height above the rail level of 76 cm.

- During the preliminary planning, the planner must consider, in accordance with Ril 813.0201, all local, operational and signal-related conditions to determine the construction length, the position of the platform and the track adaptation in coordination with the Track department: train protection system, stopping point, stopping inaccuracy. Addition: The track survey, new alignment and creation of the target track position must also be examined in the preliminary planning by the planner and in coordination with the Track department.

- During the preliminary planning, barrier-free access to the intermediate platform must be examined and ensured, as well as an individual solution with the retention of the passenger crossing. The RÜ must be adapted to the new infrastructure and brought up to the latest state of the art in this context. This is done in coordination with the Track (RÜBE calculation). The results from the RÜBE must be coordinated immediately with the I.IP-W-M department (Infrastructure Management).

- The lighting systems are to be renewed on both platforms. Note FM TA: If the 50Hz distribution needs to be adjusted, meter points must be created if not sufficiently available.

- Power and water connections as well as a sewage disposal system for cleaning work on the platforms must be provided.

- Passenger information must be ensured on both platforms by means of a DSA+ system each.

- According to PLATO, a new weather protection shelter must be erected on each platform.

- The platform equipment and the information/signage system will be replaced according to the equipment catalogue for stations of category 7.

- During the preliminary planning, variants of customer-friendly construction (acceleration of construction processes) must be examined and considered in terms of cost. Addition: Subject of the construction phase planning: During the planning, the continuous operation of the passenger information (PI) as well as the public address systems (PAS) at every platform edge in operation must be ensured. In addition, adequate weather protection (WSH) must be provided at each platform in the construction phase planning. Addition: For each release for traffic, customer-relevant functions (e.g. FIA, FAA, seating, weather protection at least as much as before the renovation) must be provided as the final state or temporary measure.

CPV codes

Engineering design services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders