France – Track construction works – Métro ligne 8 - Reconfiguration de l’interstation Créteil Université – Créteil Préfecture / Lot Voie
Description
In the context of the arrival of the new rolling stock MF19 on Line 8 of the Metro, a rearrangement of the track equipment at Créteil Préfecture is envisaged. This rearrangement involves transforming the current Track 1 and the storage track known as Track Z. The current Track D, which is a storage track, will be transformed into a main track and renamed Track 1. This new configuration will allow the operator to store trains on the future Track Z without intersecting the main tracks and to improve storage conditions in the target situation. The purpose of the present consultation is to define the conditions and modalities related to the track works, the main works of which will take place under Temporary Traffic Interruptions (hereinafter ITC) scheduled for the summers of 2027 and 2028 between Maisons-Alfort les Julliottes and Créteil Pointe du Lac stations.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Construction work for water projects – REHABILITATION D OUVRAGES D EAU POTABLE
Nîmes Métropole (30)FranceConstruction work for water projectsReservoir construction worksOverhaul and refurbishment workDeadline in 32 daysPublished on Oct 22, 2026
France – Overhaul and refurbishment work – Réhabilitation d'un ensemble immobilier situé au 3/9/15 rue Jacques HILLAIRET à PARIS XII
Fonds de Garantie des Assurances Obligatoires de DommagesFranceOverhaul and refurbishment workFacade workJoinery workDeadline in 30 daysPublished on Oct 22, 2026
France – Building alteration work – Création d'un îlot test d'allotissement dans l'unité centrale de production culinaire (UCPC) du pôle logistique des Hôpitaux Universitaires de Strasbourg situé 10 rue Hannah Arendt à Strasbourg
HUS-Etablissement support du GHT 10FranceBuilding alteration workInstallation of partition wallsFloor laying and covering workDeadline in 27 daysPublished on Oct 22, 2026
France – Surface work for highways – A7 - Entretien des chaussées - Section Mondragon/Piolenc PR 152 à 162 (sens 1&2)
AUTOROUTES DU SUD DE LA FRANCE (ASF)FranceSurface work for highwaysGranules, chippings, stone powder, pebbles, gravel, broken and crushed stone, stone mixtures, sand-gravel mixtures and other aggregatesBitumenDeadline in 19 daysPublished on Oct 22, 2026