Germany – Engineering design services for mechanical and electrical installations for buildings – Sanierung und Erweiterung Grundschule Züttlingen
Description
**Renovation and Extension of Züttlingen Primary School Based on Feasibility Study, Plans, Floor Plans and Details Office Huber, Billigheim**
**1. Initial Situation and Objectives**
The primary school in the Möckmühl district of Züttlingen is located in an existing building at Jahnstraße 5, directly adjacent to the town hall and the church. The building has functional, spatial and energy deficiencies that make comprehensive modernisation necessary. The project's aim is to renovate the existing building and extend it to meet today's pedagogical, functional and energy requirements. A holistic approach will be pursued, combining renovation, extension and energy efficiency in one project.
**2. Project Scope**
Based on a feasibility study, the following scope has been determined:
**2.1 Renovation of the Existing Building**
The existing primary school will be comprehensively modernised:
- Energy renovation (insulation, windows, building services)
- Barrier-free access (except to the attic)
- Optimisation of the room structure
- Modernisation of sanitary facilities
- Adaptation to fire protection measures
**2.2 Extension and Supplementary Building (New Construction)**
Based on the feasibility study, the extension will take place in several building sections and storeys, creating new or enlarged areas:
**Ground Floor (GF)**
- Extension of Classroom 1 (Area = 70 m²)
- Extension of Classroom 2 (Area = 73 m²)
- Covered playground (Area = 74 m²)
- New teachers' room (Area = 49.86 m²)
- Storage, tea kitchen, new toilets
- Corridor and cloakroom areas
**First Floor (FF)**
- Extension of Classroom 3 (Area = 84 m²)
- Extension of Classroom 4 (Area = 73 m²)
- New differentiation room (Area = 45 m²)
- School library (Area = 27 m²)
- New staircase and optimised traffic areas
**Attic (A)**
- Creation of a new presentation and lounge area (Area = 72 m²)
- Gallery (Area = 13.5 m²)
- Adaptation of the roof structure incl. new dormer
**Basement (B)**
- New multi-purpose room (Area = 72.78 m²)
- Canteen and kitchen
- Staff room, plant rooms, cellar areas
- Large terrace (Area = 83 m²)
**3. Functional and Pedagogical Improvements**
The renovation and extension of the school building will create a modern learning environment with:
- Larger, flexible classrooms
- Additional differentiation and group rooms
- A school library
- A multi-purpose room for events
- Improved teacher work areas
- Optimised play areas (indoor and outdoor)
The investment will make the school site in the district of Züttlingen future-proof, sustainable and pedagogically enhanced.
**4. Economy and Funding**
The planning consciously focuses on building on the existing structure to reduce costs and utilise funding opportunities. As part of the feasibility study, a cost estimate was carried out: The cost estimate according to DIN 276 results in:
Gross construction costs: 3,800,000 €
Total costs excluding land, external facilities, equipment: approx. 3.8 million €
**5. Interim Solution During Construction**
Relocation of the school operations is necessary for the construction phase. A temporary solution with containers is planned.
**6. Conclusion**
The project "Renovation and Extension of Züttlingen Primary School" represents a comprehensive modernisation that creates a clear added value both pedagogically and structurally. The combination of renovation and extension enables a sustainable, economically viable and fundable solution that strengthens the school in the long term and keeps the location of Züttlingen attractive.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Architectural services for outdoor areas – Stadt Löhne, Vergabe von Planungsleistungen für Frei- und Verkehrsanlagen i. S. d. §§ 39,47 HOAI zur Neugestaltung des Bahnhofsumfeldes
Kreis Herford im Auftrag der Stadt Löhne - Zentrale VergabestelleGermanyArchitectural services for outdoor areasNo deadline givenPublished on Nov 12, 2026
Germany – Engineering services – TGA ELT_Neubau Grund- und Gemeinschaftsschule, Gemeinde Mühlhausen im Kraichgau
Gemeinde Mühlhausen im KraichgauGermanyEngineering servicesNo deadline givenPublished on Nov 12, 2026
Germany – Engineering services – Sanierung Kilian-von-Steiner Schule Rottenburg - Technischen Ausrüstung gem. §§ 53-56 HOAI, AG 4+5, Lph 1-8
Stadt Rottenburg am Neckar- Hochbauamt -GermanyEngineering servicesDeadline in 31 daysPublished on Nov 12, 2026
Germany – Construction project management services – Stadt Braunsbedra - Strand Neumark - Projektsteuerung
Stadt BraunsbedraGermanyConstruction project management servicesNo deadline givenPublished on Nov 12, 2026