Germany – Installation of metal structures – Kläranlage Aurich-Haxtum, Bau Faulung II - Stahlbau
Description
The subject of the tender is the construction of a new digester at the Aurich-Haxtum wastewater treatment plant. The Aurich-Haxtum wastewater treatment plant treats the wastewater of the city of Aurich and the surrounding municipalities. In addition to the predominantly municipal wastewater, dairy wastewater from the local dairy Rücker is also treated at the Aurich wastewater treatment plant. The current inflow load is approximately 68,500 EWCSB. A sludge digestion plant has been operated at the wastewater treatment plant since 1963 to stabilize and reduce the primary sludge produced during wastewater treatment. Despite ongoing optimizations and renovations, the sludge digestion has reached its performance limit due to increased inflow loads. The existing digester capacity is only sufficient for the primary sludge and the flotation sludge produced during the pretreatment of the dairy wastewater. The digestion process is occasionally overloaded, leading to difficult operating conditions. During maintenance and repair work on the digester (age approx. 60 years), there are currently no reserve capacities available. It is currently not possible to utilize the excess sludge (ÜS) energetically, as the digester with a digestion time of far less than 20 days is already overloaded. Therefore, all ÜS sludge is stabilized in a composting plant. Operating the sludge composting requires a lot of space, results in high sludge disposal costs, and is generally uneconomical. In the long term, the operation of the composting plant is to be discontinued, and the ÜS sludge is to be fed to a sludge digestion for energetic utilization and sludge reduction. For this reason, the construction of a sludge digester for the ÜS sludge is necessary. This includes the following measures:
- Construction of a new digester for ÜS sludge incl. operating building
- Erection of a new gas storage and emergency flare
- Installation of a new CHP plant and digester gas purification
- (Installation of a sludge disintegration; planned later)
- (Installation of a reception station for fats and co-substrates; planned later)
- Integration of the new construction measure into the existing plant and control technology
The Aurich wastewater treatment plant is located in Haxtum. Address: Kläranlage Aurich Haxtum Zum Antjebitt 1 26605 Aurich
Scope of services of the contract unit
The essential scope of services of the contract unit is listed below for each specialist trade.
- Trade 1 Earthworks (already awarded)
- Trade 2 Excavation
- Trade 3 Structural work
- Trade 4 Steel construction
- Trade 5 Roofing work
- Trade 6 Façade construction
- Trade 7 Door/window construction
- Trade 8 Plastering work
- Trade 9 Screed work
- Trade 10 Tiling work
- Trade 11 Painting work
- Trade 12 Mechanical engineering
- Trade 13 EMSR engineering
- Trade 14 CHP engineering
- Trade 15 Demolition and dismantling of the former gas flare plant
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Track construction works – 27_Rastatt
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)GermanyTrack construction worksDeadline in 12 daysPublished on Nov 11, 2026
Germany – Joinery and carpentry installation work – 2000-6 Erweiterung VG Heidelberg - Büroschränke
Eigenbetrieb Bau, Vermögen und Informationstechnik Rhein-Neckar-KreisGermanyJoinery and carpentry installation workDeadline in 31 daysPublished on Nov 11, 2026
Germany – Library construction work – Kloster Waldsassen - Sanierung und Neuausrichtung der Bibliothek Innenputz und Malerarbeiten
Zisterzienserinnnen-Abtei WaldsassenGermanyLibrary construction workPlastering workDeadline in 32 daysPublished on Nov 11, 2026
Germany – Library construction work – Kloster Waldsassen - Sanierung und Neuausrichtung der Bibliothek Instandsetzung Holzeinbauten Bibliothek
Zisterzienserinnnen-Abtei WaldsassenGermanyLibrary construction workJoinery workDeadline in 32 daysPublished on Nov 11, 2026