Back to search
This tender has been withdrawn.
Austria – Structural steelworks – SONNENKRAFTWERK NÖ - UK Hochegg - Stahlbau
Land Niederösterreich, p.A. Amt der NÖ-LandesregierungAustriaPublished on Aug 10, 2026
Deadline passedDescription
The Province of Lower Austria, represented by the Office of the Lower Austrian Provincial Government, Department of Building and Property Management, intends - as part of the SONNENKRAFTWERK NÖ project - to construct photovoltaic systems on Lower Austrian state buildings. At the UK Hochegg site, a PV open-space system and a PV-covered parking lot are to be erected. The steel construction work required for this is the subject of this procurement procedure.
CPV codes
Structural steelworks
Documents & submission
AI summary
Sign in for an AI summaryContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Austria – Construction work for railways and cable transport systems – Bludenz; Adaptierung Ausfahrt Richtung Arlberg; Bau - Baumeisterarbeiten Hauptbaumaßnahmen
ÖBB-Infrastruktur AGAustriaConstruction work for railways and cable transport systemsNo deadline givenPublished on Oct 22, 2026
Austria – Ancillary works for pipelines and cables – Konzernrahmenvereinbarung Horizontalbohrungen HDD 2027-2031 (Option bis 2035)
TIWAG-Tiroler Wasserkraft AG und weitere Auftraggeber gemäß AusschreibungsunterlagenAustriaAncillary works for pipelines and cablesConstruction work for electricity power linesGas supply mains construction workNo deadline givenPublished on Oct 22, 2026
Austria – Metalworking – 1030 Wien, Leberstr. 4c - Sanierung Fassade/Fenster in 4 Bauphasen - Schlosserarbeiten BA2027
Bundesimmobiliengesellschaft m.b.H.AustriaMetalworkingDeadline in 30 daysPublished on Oct 22, 2026
Austria – Metal roof-covering work – 3496_6020 Innsbruck, Technikerstraße 11, Erweiterung Technische Versuchs- und Forschungsanstalt TVFA, 205500_Bauspengler_und_Schwarzdeckerarbeiten
Bundesimmobiliengesellschaft m.b.H.AustriaMetal roof-covering workRoof insulation workDeadline in 40 daysPublished on Oct 21, 2026