Romania – Gas supply mains construction work – Servicii de proiectare, asistenta tehnica din partea proiectantului si executie lucrari in vederea realizarii proiectului „Infiintare retea distributie gaze naturale in comunele Scheia si Mironeasa din judetul Iasi”
Description
The subject of the contract for works to be awarded consists of the provision of Design Services, technical assistance from the designer and execution of works for the implementation of the project "Establishment of a natural gas distribution network in the communes of Scheia and Mironeasa, Iasi County". The natural gas supply system for the communes of Șcheia and Mironeasa will include the establishment of the network in all localities of the communes. A. Pressure regulation and measurement station. B. Natural gas supply network. C. Special works on the natural gas supply network 1. Branches to the gas network The feasibility study takes into account technical and economic elements regarding the implementation of individual branches to the gas network, as these will be an integral part of the optimal operation of the gas network, after the commissioned natural gas supply system. Thus, on the designed gas network, a number of 1775 branches are proposed (760 in the commune of Șcheia and 1015 in the commune of Mironeasa). The total length of the branch pipes, in the communes of Șcheia and Mironeasa, along the route of the designed network, is 17750 m and will be made of PEHD, SDR11, Dn 32 mm. In some places, the branch pipe will need to pass under the asphalted roads within the commune. These will be protected with a PEHD protective pipe, 150 mm. The total length of the crossings is 3550 m. In the end, the execution of an "intelligent" gas system, equipped with data transmission technology, is desired. 2. Road and stream crossings 3. Execution of the distribution network with horizontal directional drilling 4. Works of dismantling and reconstruction of asphalted roads 5. Works of dismantling and reconstruction of roadside gutters. 6. Works of dismantling and reconstruction of ballasted roads. Total duration of the implementation of the subject: 24 months, of which: 2 months (60 days) for design and 22 months of effective execution until acceptance upon completion of the works as well as the warranty period of the works until final acceptance (36 months). The deadline by which the contracting authority will respond clearly and completely to all requests for clarification/information is 11 days before the deadline for submission of tenders. Number of days until which clarifications can be requested before the deadline for submission of tenders/applications: 18 days.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Romania – Urban development construction work – Servicii de elaborare a documentației tehnico-economice la stadiul PT + DDE, asistență tehnică din partea proiectantului, execuție lucrări în cadrul proiectului Regenerarea urbana a raului Cuejdiu in scopul cresterii spatiului pietonal, de promenada, si de petrecere a timpului liber prin amenajarea unei infrastructuri specifice activitatilor culturale si de recreere-TRONSON 2- LOT 1
Municipiul Piatra NeamtRomaniaUrban development construction workRoadworksEngineering design services for the construction of civil engineering worksDeadline in 45 daysPublished on Oct 05, 2026
Romania – Thermal insulation work – Transformarea Liceului Teoretic German „Johann Ettinger” în clădire NZEB
Municipiul Satu MareRomaniaThermal insulation workElectrical installation workPlumbing and sanitary worksDeadline in 21 daysPublished on Oct 05, 2026
Romania – Overhaul and refurbishment work – Servicii de elaborare a documentației tehnico-economice la stadiul PT + DDE, asistență tehnică din partea proiectantului, execuție lucrări în cadrul proiectului cu titlul „Eficientizare energetica sala polivalenta in municipiul PIATRA-NEAMT”
Municipiul Piatra NeamtRomaniaOverhaul and refurbishment workEngineering design services for the construction of civil engineering worksTechnical assistance servicesDeadline in 37 daysPublished on Oct 05, 2026
Romania – Hospital facilities construction work – SERVICII DE ELABORARE A DOCUMENTAȚIEI TEHNICO-ECONOMICE LA STADIUL PT + DDE, ASISTENȚĂ TEHNICĂ DIN PARTEA PROIECTANTULUI, EXECUȚIE LUCRĂRI ȘI FURNIZARE DOTĂRI ÎN CADRUL PROIECTULUI CU TITLUL „EXTINDERE CORP C2, MODIFICĂRI INTERIOARE ȘI EXTERIOARE, SUPRAETAJARE, MODERNIZARE FAȚADE ȘI AMENAJARE EXTERIOARĂ. MODIFICARE ȘI RELOCARE CORPURI C3 ȘI C4 – FAZA 1”
SPITALUL CLINIC COLTEARomaniaHospital facilities construction workMedical equipmentsEngineering design services for the construction of civil engineering worksDeadline in 48 daysPublished on Oct 05, 2026