Germany – Floor laying and covering work – Neubau Gesamtschule Altenessen-Süd (GEA), Erbslöhstr. 3, 45326, Bodenbelagsarbeiten
Description
The City of Essen plans to establish and construct a 6-track comprehensive school and a triple sports hall, two single sports halls and ancillary facilities at Erbslöhstraße in the Altessen-Süd district due to increasing student numbers and increased demand for comprehensive school places in the city of Essen. The building consists of four structural units (A-D) arranged around a central fifth structural unit (E). The outer structural units A-D enclose the central structural unit at the building corners, so that all structural units are structurally connected to each other. The structural units or components A to E serve as school buildings. In addition to the school, component A also houses the triple sports hall plus 2 single sports halls with stands and changing facilities.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Siteworks – Ministerium für Wirtschaft, Touris., Landwirt. und Forsten des Landes S.- A. / Modernisierung der Überbetrieblichen Ausbildungsstätte in Iden, Baustelleneinrichtung
Ministerium für Wirtschaft, Tourismus, Landwirtschaft und Forsten des Landes Sachsen-AnhaltGermanySiteworksConstruction workDeadline in 29 daysPublished on Sep 07, 2026
Germany – Tiling work – Revitalisierung Bauhaus Trabelsdorf: BAU-11-Fliesenarbeiten
Gemeinde LisbergGermanyTiling workDeadline in 30 daysPublished on Sep 07, 2026
Germany – Floor laying and covering work – Revitalisierung Ringstraße 60 Los 16 Bodenleger
Leipziger Wohnungs-und Baugesellschaft mbHGermanyFloor laying and covering workDeadline in 41 daysPublished on Sep 07, 2026
Germany – Heating, ventilation and air-conditioning installation work – Sanierung Turnhalle Franz-Marc-Schule Geretsried 402 Heizung Sanitär
Landratsamt Bad Tölz - WolfratshausenGermanyHeating, ventilation and air-conditioning installation workGymnasium construction workDeadline in 22 daysPublished on Sep 07, 2026