Czechia – Street-lighting equipment – Rekonstrukce, modernizace a provozování veřejného osvětlení v Plzni
Description
The subject of the public procurement is the reconstruction and modernisation of the public lighting system (hereinafter "VO"), the implementation of which is planned in 2 stages. Part of the I. stage is the replacement of all public lighting luminaires, with the exception of luminaires listed in the Technical Specification. The first stage also includes the performance of light technical calculations, field surveys, concretisation of necessary actions, specification of required works and materials and the performance of other necessary preparatory works. Furthermore, in the first stage, 60% of the switching and control distributors will be replaced and the remaining distributors will be equipped with SW and HW for control and commissioning of the control room. The first stage also includes the classification of individual locations of the city into zones of the lighting environment in accordance with ČSN 36 0459 (or equivalent), this classification must be approved by the authorised representative of the contracting authority (Statutory City of Plzeň). The classification of the city locations into zones of the lighting environment will be preceded by the processing of light technical calculations in the given location. Part of the II. stage is the complete replacement of public lighting poles and lanterns with the exception of poles for pedestrian crossing illumination, poles with architectural and scenic lighting, stylish historical poles, plastic poles or poles installed in other structures and emergency poles installed in the last 5 years (approx. 500 units). Furthermore, in the second stage, the replacement of cable networks of public lighting will be carried out in places with the highest occurrence of faults and in places where it is necessary for the connection of changed poles. The estimated need for replacement is approx. 5% of all cable networks, i.e. approx. 34 km. The subject of the public procurement also includes the maintenance and operation of the entire public lighting system including lighting locations, the reconstruction and modernisation of which will not be in its responsibility (i.e. will not be the subject of the public procurement). The supplier will take over the public lighting system for maintenance and operation after the effectiveness of the concluded contract in a predetermined time for the mobilisation of resources (e.g. 1-3 months), but the responsibility for the functionality of the new elements will be transferred gradually, and that is according to the progress of the reconstruction and modernisation of the system. It is expected that the supplier will ensure the maintenance and operation of the entire public lighting system for a period of 15 years.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Czechia – Railway and tramway locomotives and rolling stock and associated parts – Rámcová dohoda na dodávky nových hydraulických tlumičů
České dráhy, a.s.CzechiaRailway and tramway locomotives and rolling stock and associated partsNo deadline givenPublished on Oct 26, 2026
Czechia – Trolleybuses – Rámcová dohoda na nákup až 140 ks bateriových trolejbusů II
Dopravní podnik hl. m. Prahy, akciová společnostCzechiaTrolleybusesRepair and maintenance services of motor vehicles and associated equipmentDeadline in 31 daysPublished on Oct 26, 2026
Czechia – Firefighting vehicles – Vyšetřovací automobily
Hasičský záchranný sbor Karlovarského krajeCzechiaFirefighting vehiclesDeadline in 28 daysPublished on Oct 25, 2026
Czechia – Road traffic-control equipment – Modernizace řízení světelných křižovatek, statutární město Chomutov
Statutární město ChomutovCzechiaRoad traffic-control equipmentTraffic-flow measuring systemControl, safety or signalling equipment for roadsDeadline in 29 daysPublished on Oct 25, 2026