Skip to content
Back to search

Poland – Road construction works – Budowa drogi dla pieszych i rowerów wzdłuż DK 55 na odcinku Malbork - Sztum

Generalna Dyrekcja Dróg Krajowych i AutostradPolandPublished on Nov 17, 2026
15 days left

Description

The order covers the construction of a pedestrian and cycle path from existing km 26+612 to existing km 34+384 of national road no. 55. The task includes, among others: • construction of a pedestrian and cycle path, • reconstruction of national road no. 55 over a section of approx. 901 m, • reconstruction of junctions along the planned pedestrian and cycle path, • construction of bicycle service facilities (BSF), • reconstruction of a level crossing, • construction of a technological canal, • construction of pedestrian crossing lighting, • construction of drainage within the scope of the planned pedestrian and cycle path and reconstruction within the scope of the existing drainage of the national road, • construction of a retention-infiltration tank, • reconstruction of infrastructure networks in conflict with the planned solutions, • installation of traffic safety devices. The estimated value of the order is between 5 404 000 euro and 20 000 000 euro.

CPV codes

Road construction worksSite preparation workBuilding demolition and wrecking work and earthmoving workSiteworksExcavating and earthmoving workDemolition, site preparation and clearance workWorks for complete or part construction and civil engineering workConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkConstruction, foundation and surface works for highways, roadsConstruction and ancillary works for telephone and communication linesCycle path construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders