Czechia – Road construction works – I/50 Bučovice, obchvat
Description
The subject of the contract is the construction of the I/50 road in a new route around the town of Bučovice. The construction starts approximately 50 m west of the junction with the III/0506 road to Maref at the passport kilometre 17,690. The connection of the construction to the original route of I/50 is at the end of the local part of Vícemilice at the passport kilometre 23,530. The total length of the construction is 5570 m. The new route of the road will be built as a directionally separated two-lane carriageway in the initial and final sections in the design category S 11,5/90, the remaining central part will correspond to the category S 13,5/90 (2+1 layout) with a length of 1990 m without acceleration lanes. The new route crosses a railway line 2 times and there are 3 grade-separated intersections, 6 bridges on the I/50 road, 1 bridge over the I/50 road, 2 bridges off the I/50 road, 3 retaining walls, which are designed as separate structural objects. The construction also includes the construction of 2 at-grade intersections, 6 relocations of lower-category roads, 2 accesses to retention ponds, exits and temporary bypass roads. Furthermore, an integral part of the construction are water management structures, relocations of affected engineering networks, the establishment of embankments, noise barriers.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Czechia – Construction work – Přestavba a dovybavení Kliniky infekčního lékařství ve FN Ostrava
Fakultní nemocnice OstravaCzechiaConstruction workRefurbishment workConstruction work for buildings relating to healthDeadline in 17 daysPublished on Nov 08, 2026
Czechia – Road construction works – Sanace, rekultivace a revitalizace území po těžbě štěrkopísku u Hlučína – II. etapa
Ministerstvo financíCzechiaRoad construction worksParking lot construction workConstruction work for water and sewage pipelinesDeadline in 16 daysPublished on Nov 08, 2026
Czechia – Construction work – Revitalizace bývalého areálu HEDVA
Město ŠumperkCzechiaConstruction workMulti-dwelling buildings construction workConstruction work for highways, roadsDeadline in 28 daysPublished on Nov 08, 2026
Czechia – Construction work – AREÁL PRO SENIORY - VELKÉ BÍLOVICE - DOMY A BYTOVÝ DŮM NA ULICI ČEJKOVSKÁ
Město Velké BíloviceCzechiaConstruction workDeadline in 14 daysPublished on Nov 08, 2026