Skip to content
Back to search

Austria – Ancillary works for pipelines and cables – Rahmenvereinbarung Grabungsarbeiten Nord- und Osttirol

TIWAG-Tiroler Wasserkraft AG vertreten durch TINETZ-Tiroler Netze GmbHAustriaPublished on Sep 27, 2026
No deadline given

Description

Excavation works are required for the cabling of low and medium voltage systems in North and East Tyrol. Definition of excavation/ civil engineering works:

•Removal of paved and unpaved surfaces

•Excavation, bedding, backfilling works and restoration of the original surface

•Cable laying works of a low and/or medium voltage system

•Laying of empty conduits of various dimensions and materials

•Drawing in of a low and/or medium voltage system in existing empty conduits

•Concrete works (e.g. mast foundations) of minor extent

CPV codes

Ancillary works for pipelines and cables

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders