Germany – Architectural services for buildings – Generalplanung
Description
The five-storey administrative building of the city of Solingen at Bonner Straße 100 with a gross floor area of approximately 15,000 m² is to be comprehensively renovated while in operation. The renovation includes both the building envelope and the interior fittings and technical building equipment, taking into account the existing building substance.
1. Building Envelope
Renovation of the facade
Roof renovation
Replacement of windows
Installation of sun protection systems
Scaffolding for external works
2. Technical Building Equipment
Renovation of electrical installations
Conversion to LED ceiling lighting
Modernisation of heating and sanitary installations
Renovation of WC installations
Renovation of ventilation systems/central units
Renovation of control technology (MSR technology)
Renovation of air duct installation
Renovation of air outlets
3. Interior Fittings
Renovation of floor coverings
Painting work
Installation of suspended ceilings
Fitting out and modernisation of tea kitchens
Upgrading of meeting rooms
Redesign of the foyer with a new reception desk
4. Common and Special Areas
Upgrading of the canteen (multi-use)
Adaptation of lift vestibules
Additional measures to improve the quality of stay
In the interior, the office and circulation areas are to be refurbished. This includes floor coverings, lighting, wall and door surfaces, and the laying of electrical cables within the floors to ensure a modern and functional room structure. The sanitary facilities are to be modernised, while the tea kitchens are to be converted into extended stay areas. The canteen will be equipped with a new floor covering and modern lighting; optionally, flexible room division by folding wall should be feasible. The ventilation technology must be renewed. The ventilation systems in the canteen section of the building (also referred to as "Casino" in old documents) date mostly from the original building substance of 1974. Therefore, renewal of the ventilation central units is advisable as part of a general and comprehensive renovation, as the units have far exceeded their service life and no longer meet today's hygienic and energy standards. The plant room in the ventilation central unit in the basement is also suitable for today's ventilation units, with looped heat recovery systems being an option due to space constraints. The MSR technology dates from 2002 and has reached the end of its service life and would also be renewed as part of the equipment replacement. The fire dampers can be reused, but the existing inventory lacks motorised drives. Currently, the examining expert has not identified any deficiency here, but from other objects with different examiners, the requirement to prevent cold smoke logging in the event of a plant failure is known. The air ducts in the ventilation central unit would be renewed, while the ducts in the building can mostly be reused after cleaning. There is a risk that during the construction process it turns out that, for example, the flange seals on ducts are no longer tight, in which case the technical and structural effort would be considerably higher. The previous supply air outlets had only limited effectiveness above the panel ceiling. With the change of ceiling, the outlets must also be renewed. No changes to air outlets are planned in the cellar rooms and the kitchen.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Analysis services – Rahmenvertrag über die Untersuchung von PFAS in Wasser für die Jahre 2027-2029, Grund-und Oberflächenwasser
Bayerisches Landesamt für UmweltGermanyAnalysis servicesOther pollution investigation servicesDeadline in 30 daysPublished on Oct 27, 2026
Germany – Architectural and related services – "Schulzentrum Ichenheim", Architektenleistungen
Gemeinde Neuried, RathausGermanyArchitectural and related servicesEngineering servicesNo deadline givenPublished on Oct 27, 2026
Germany – Engineering design services – SV-JWA-261026-004 - Modernisierung U-Bahnhof Odeonsplatz, Planung Baulogistik
Stadtwerke München GmbHGermanyEngineering design servicesDeadline in 33 daysPublished on Oct 27, 2026
Germany – Ground investigation services – Rahmenvertrag Baugrunduntersuchungen 2027-2029
Landeshauptstadt Hannover - Fachbereich TiefbauGermanyGround investigation servicesDeadline in 37 daysPublished on Oct 27, 2026