France – Advisory and consultative engineering services – ASSISTANCE A MAITRISE D'OUVRAGE POUR LE SUIVI ET LE CONTROLE DE LA CONSTRUCTION DE LA NOUVELLE USINE DE VALORISATION ENERGETIQUE DE TOULOUSE
Description
The present contract concerns the support of Decoset in all the study, design, implementation, commissioning and acceptance phases of the new Energy Valorisation Unit of Toulouse (31), for which Evonéo is the project owner. The works on the current Bessières and Toulouse plants are managed under a framework agreement and are not the subject of this contract. The new plant will be located to the south of the current site on the ash landfill, which will be deconstructed in summer 2026 with a transfer of ash treatment to the new IME of Muret (31), 11 chemin de perpignan 31100 Toulouse. More specifically, all the technical provisions and the description of the missions are detailed in the CCTP.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Architectural, construction, engineering and inspection services – L’ISLE-EN-RIGAULT – Papeterie Jeand’Heurs – Curage, désamiantage, déconstruction partielle et mise en sécurité – Mission de maîtrise d’œuvre
EPFGEFranceArchitectural, construction, engineering and inspection servicesDeadline in 30 daysPublished on Sep 17, 2026
France – Architectural, construction, engineering and inspection services – CONCOURS INTERNATIONAL DE MAÎTRISE D'OEUVRE POUR LA CREATION DU MUSEE MEMORIAL DU TERRORISME
OPPICFranceArchitectural, construction, engineering and inspection servicesMuseum-exhibition servicesNo deadline givenPublished on Sep 17, 2026
France – Environmental engineering consultancy services – Mission d’études et d’assistance à maitrise d‘ouvrage sites et sols pollués pour la réalisation du plan de gestion et du plan de conception travaux ainsi que la maitrise d’œuvre des travaux de dépollution des friches BP / Total / ville et Guichard
Commune de Lucé (28)FranceEnvironmental engineering consultancy servicesDeadline in 29 daysPublished on Sep 17, 2026
France – Environmental engineering consultancy services – Élaboration et mise en oeuvre du plan de gestion des sédiments du littoral coutançais et étude de faisabilité pour l'adaptation d'ouvrages transversaux
Communauté communes Coutances mer et bocageFranceEnvironmental engineering consultancy servicesFeasibility study, advisory service, analysisDeadline in 30 daysPublished on Sep 17, 2026