France – Construction work – Marché de conception-réalisation pour la réhabilitation en site occupé de 120 logements 18-20-22, rue de la Pelouse à 25000 - Besançon
Description
The operation concerns the rehabilitation of 120 occupied dwellings spread across three buildings located at 18, 20 and 22 rue de la Pelouse in Besançon. The three buildings, each comprising 40 dwellings, are listed in the Strategic Property Plan of Loge GBM. The operation primarily involves the energy rehabilitation of the dwellings, improvement of user comfort, upgrading of technical equipment, securing of structures, and landscaping of outdoor spaces. The project aims to durably improve the performance of the building and systems, notably through the treatment of the envelope, evolution of the energy production mode, improvement of ventilation, targeted rehabilitation of dwellings, and upgrading of common areas and surroundings.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Construction work – Travaux de reconstruction du barrage du lac de Saint Point (25)
EPAGE HAUT DOUBS HAUTE LOUEFranceConstruction workDeadline in 36 daysPublished on Oct 28, 2026
France – Construction work – Travaux d'entretien et de grosses réparations dans les bâtiments communaux de la Ville de Neuilly-sur-Seine (lots 1,2,5,10 et 12)
Ville de Neuilly-sur-SeineFranceConstruction workMasonry and bricklaying workRoof-covering workDeadline in 32 daysPublished on Oct 28, 2026
France – Engineering works and construction works – Accord-cadre de travaux de réparation d’ouvrages d’art, murs, tunnels et ouvrages de traversées hydrauliques sur l’ensemble du réseau autoroutier ESCOTA
ESCOTA SOCIETE DES AUTOROUTES ESTEREL, COTE D'AZUR, PROVENCE, ALPESFranceEngineering works and construction worksDeadline in 22 daysPublished on Oct 28, 2026
France – Construction work – Travaux divers sur les bâtiments communaux de Saint-Joseph - année 2027 (Marché n°26AO016)
Commune de Saint-JosephFranceConstruction workStructural shell workErection and related works of roof frames and coveringsDeadline in 43 daysPublished on Oct 28, 2026