Poland – Road construction works – Rozbudowa drogi wojewódzkiej nr 559 w km 45+060 do km ok 46+730 w m. Maszewo Duże, gm. Stara Biała – nr postępowania 148/26

Mazowiecki Zarząd Dróg Wojewódzkich w WarszawiePolandPublished on Oct 06, 2026
Deadline passed

Description

The subject of the contract is the "Expansion of the Voivodeship Road No. 559 from km 45+060 to km 46+730 in Maszewo Duże, Stara Biała Commune" – procedure number 148/26. 2. The Detailed Description of the Subject of the Contract is in the Tender Documentation (Part IV SWZ), in the Scope of Works - available only for viewing (Part V SWZ) and in the Cost Estimate (in the scope of the utilization of destruct containing exceeded permissible limits of polycyclic aromatic hydrocarbons - Part VI SWZ). The Contractor is to calculate the value of the works based on the attached project documentation, based on the quantity of asphalt destruct designated for utilization indicated in the OWU, detailed technical specifications, general conditions of the contract for the execution of construction works. 3. The Contractor is obliged to ensure, at their own expense, safe conditions for road and pedestrian traffic in the area of the works covered by the contract, based on the project of traffic organization, "for the construction period" prepared by and at the expense of the Contractor. The Contractor is obliged to update the project of permanent traffic organization. 4. In the event of trademark, patent, or origin, source, or special process indications in the description of the subject of the contract, which characterize the product or services provided by a specific contractor, the Purchaser allows equivalent solutions. 5. In the event of references in the description of the subject of the contract to standards, European technical assessments, approvals, technical specifications, and technical reference systems, the Purchaser allows equivalent solutions described. 6. The Contractor is obliged to transfer the copyrights to the photographic and film documentation, about which is mentioned in the general conditions of the contract for the execution of construction works. 7. The Purchaser envisages the awarding of contracts, about which is mentioned in art. 214 para. 1 point 7 of the PZP Act, to a total net value of 20,910,211.98 PLN. Within the framework of a similar contract, the following works are envisaged to be carried out: - preparatory works, - works in the scope of greenery management, - demolition works, - earthworks, - substructures, - installation of protective devices, - curbs, gutters, edges and pavements, - reinforcement of the soil subgrade, - road safety devices, - works in the scope of traffic organization and BRD, - finishing works, - works in the scope of stormwater and sanitary sewerage, - works in the scope of water supply and pipelines, - works in the telecommunications sector, - works in the power sector, - construction of road lighting. The aforementioned works relate to the section on which the construction works will be carried out and/or adjacent sections. 8. The Contractor is obliged to have a Liability Insurance Policy for damages caused during the execution of the contract in the subject of the contract as well as to third parties for the entire period of the contract's validity and for a guarantee sum of not less than 20,000,000.00 PLN. 1) The Contractor is obliged to submit a copy of the aforementioned policy within 7 days from the date of signing the contract. Provided that the insurance is continuous, the Purchaser allows the possibility of presenting several policies during the contract period confirming the possession of Liability Insurance. 2) The Contractor is obliged to submit to the Purchaser a copy of the next policy within 7 days from the expiry of the validity period of the previous policy. If the Contractor fails to comply with the above, the Purchaser will charge the Contractor contractual penalties in the amount specified in the contract. 3) In the event of failure to submit the policy within 30 days from the date of signing the contract, the Purchaser will have the right to withdraw from the contract. 9. Contract implementation period: 21 months from the date of signing the contract, including: - 18 months from the date of signing the contract – deadline for the execution of works; - up to 21 months from the date of signing the contract - deadline for the implementation of the subject of the contract. The Contractor is obliged to comply with the following set intermediate deadlines (milestones) for the execution of works and the sequence of their implementation: I Milestone - execution of works (confirmed by a partial protocol of acceptance of works) of a value not less than 30% of the gross remuneration for the execution of the entire subject of the contract (excluding remuneration for utilization together with the transport of asphalt destruct containing exceeded permissible limits of polycyclic aromatic hydrocarbons) within a deadline not later than 8 months from the date of signing the contract. II Milestone - execution of works (confirmed by a partial protocol of acceptance of works) of a value not less than 60% of the gross remuneration for the execution of the entire subject of the contract (excluding remuneration for utilization together with the transport of asphalt destruct containing exceeded permissible limits of polycyclic aromatic hydrocarbons) within a deadline not later than 14 months from the date of signing the contract. III Milestone - execution of 100% of works (confirmed by the Purchaser with a final protocol of acceptance of works without significant defects/defects) within a deadline not longer than the final deadline for the acceptance of works. No later than before the deadline of III Milestone, the Contractor is obliged to present to the Purchaser documents confirming the execution in accordance with the applicable law of the utilization of asphalt destruct containing exceeded permissible limits of polycyclic aromatic hydrocarbons. The Purchaser, in accordance with the conditions of the contract, allows the possibility of changing the implementation deadline of intermediate deadlines. For the non-implementation of the set intermediate milestone deadline, the Purchaser will have the right to charge contractual penalties in accordance with the contract. 10. The Purchaser envisages the application of the so-called reverse procedure, about which is mentioned in art. 139 para. 1 of the Pzp Act. 11. In accordance with art. 257 of the Pzp Act, the Purchaser envisages the possibility of invalidating the subject of the proceedings, if the public funds, which the Purchaser intended to allocate for the financing of the entire or part of the contract, have not been granted to him.

CPV codes

Road construction worksSurface work for roadsWorks related to water-distribution pipelinesStorm-water piping construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders