France – Catenary's construction works – VOIE Z TERTRE OPTIMISEE - TRAMWAY LIGNE 1 MT1 - Travaux de Ligne Aérienne de Contact
Description
This consultation aims to select the contractor for the overhead contact line (OCL) works for the tramway as part of the operation to create a maneuvering zone (optimized track Z) in the Tertre sector, on line 1 west. The OCL services to be carried out by the contractor concern the following areas: - Execution studies; - Construction of foundations for new OCL supports; - Reinforcement of existing OCL structures; - Removal of the communication cable from anchor to anchor (supports 1789 and 1797); - Supply and installation of new OCL supports and their fittings, portal and flexible return; - Supply and installation of the cable from track 1 to track Z, from anchor to anchor; - Supply and installation of the cable from track 2 to track Z, from anchor to anchor; - Supply and installation of section insulators; - Controls and tests The file of the executed works; The complete details of the services are set out in the CCTP
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Construction work for water projects – REHABILITATION D OUVRAGES D EAU POTABLE
Nîmes Métropole (30)FranceConstruction work for water projectsReservoir construction worksOverhaul and refurbishment workDeadline in 33 daysPublished on Oct 22, 2026
France – Overhaul and refurbishment work – Réhabilitation d'un ensemble immobilier situé au 3/9/15 rue Jacques HILLAIRET à PARIS XII
Fonds de Garantie des Assurances Obligatoires de DommagesFranceOverhaul and refurbishment workFacade workJoinery workDeadline in 31 daysPublished on Oct 22, 2026
France – Building alteration work – Création d'un îlot test d'allotissement dans l'unité centrale de production culinaire (UCPC) du pôle logistique des Hôpitaux Universitaires de Strasbourg situé 10 rue Hannah Arendt à Strasbourg
HUS-Etablissement support du GHT 10FranceBuilding alteration workInstallation of partition wallsFloor laying and covering workDeadline in 28 daysPublished on Oct 22, 2026
France – Surface work for highways – A7 - Entretien des chaussées - Section Mondragon/Piolenc PR 152 à 162 (sens 1&2)
AUTOROUTES DU SUD DE LA FRANCE (ASF)FranceSurface work for highwaysGranules, chippings, stone powder, pebbles, gravel, broken and crushed stone, stone mixtures, sand-gravel mixtures and other aggregatesBitumenDeadline in 20 daysPublished on Oct 22, 2026