France – Railway construction works – RER A - ITC FOBO 2027
Description
As part of the Ballasted Track Renewal (hereinafter RVB) project for the Vincennes / Marne la Vallée Chessy and Vincennes / Boissy Saint Leger branches located to the east of RER Line A, a work campaign is scheduled for the summer of 2027. In this context, platform drainage works (hereinafter ASS) and trackwork renewal (hereinafter RAV) are to be carried out under Temporary Interruption of Traffic (hereinafter ITC) for 4 weeks in August 2027 from 31/07/27 PDS to 23/08/27 PDS. The works are located between Vincennes and Nogent between PK 7.216 and 8.022. RATP defines two mandatory technical scenarios: – Scenario 1: 1042mlv of main track, ADV included They cover the following PKs: • Track 1 from PK 7220 to PK 7739 (519m) • Track 2 from PK 7216 to PK 7739 (523m) – Scenario 2: 1608mlv of main track, ADV included They cover the following PKs: • Track 1 from PK 7220 to PK 8022 (802m) • Track 2 from PK 7216 to PK 8022 (806m)
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Refurbishment of run-down buildings – Chambéry- Bâtiment "La Serpolière" - Rénovation thermique et technique d'un bâtiment résidentiel collectif de 59 logements en site occupé Consultation marché de travaux
Cristal HabitatFranceRefurbishment of run-down buildingsInstallation of metal joinery except doors and windowsDeadline in 55 daysPublished on Oct 28, 2026
France – Installation of traffic monitoring equipment – Réalisation du Contournement Ouest de Montpellier – Equipements dynamiques
AUTOROUTES DU SUD DE LA FRANCE (ASF)FranceInstallation of traffic monitoring equipmentInstallation of illuminated road signsInstallation of traffic lightsDeadline in 35 daysPublished on Oct 28, 2026
France – Electrical installation work – Travaux clef en main en Electricité et automatisme de la centrale de production de chaleur - DSP MANDELIEU
DALKIA MEDITERRANEE ou toute société de projet constituée par Dalkia MéditerranéeFranceElectrical installation workDistrict-heating plant construction workHeating worksNo deadline givenPublished on Oct 28, 2026
France – Sewerage work – Accord-Cadre - Réhabilitation de colonnes EU/EP/EV
Pas-de-Calais habitatFranceSewerage workPlumbing and sanitary worksDeadline in 32 daysPublished on Oct 28, 2026