Skip to content
Back to search

Poland – Construction work – Odbudowa infrastruktury wodno-kanalizacyjnej uszkodzonej przez powódź na obszarze Gminy Kłodzko.

"Wodociagi Gminy Kłodzko" sp. z o.o.PolandPublished on Nov 09, 2026
18 days left

Description

The subject of the contract is the comprehensive execution of construction works as part of the task/project entitled „Reconstruction of water and sewerage infrastructure damaged by the flood in the area of the Municipality of Kłodzko”. The contract is divided into 3 parts: Part No. 1–„Reconstruction and reconstruction of the Sewage Treatment Plant in Ołdrzychowice Kłodzkie”. Part No. 2–„Reconstruction and reconstruction of the Water Treatment Plant (WTP) along with water intakes”: WTP Krosnowice II 204, WTP Krosnowice I ul. Wodna, WTP Jaszkowa. Part No. 3–„Reconstruction of sewage pumping stations destroyed by the flood from the area of the Municipality of Kłodzko along with the reconstruction of emergency sections of the water supply network in Krosnowice”. The detailed description of the subject of the contract, technical requirements, scope of works, project documentation, requirements are specified in the OPZ along with the annexes. 2. The Contracting Authority, in accordance with art. 139 of the Pzp Act, will first carry out an examination and evaluation of the offers, and then carry out the substantive qualification of the contractor, whose offer was the highest rated, in terms of the absence of grounds for exclusion and the fulfillment of the conditions for participation in the procedure (reverse procedure). In accordance with art. 139.2 of the Pzp Act, the Contracting Authority provides that the JEDZ will not be submitted with the offer, but on request by the contractor, whose offer was the highest rated. 3. The Contracting Authority requires compliance with the DNSH principle (Do No Significant Harm), understood as the implementation of the contract in a manner that limits the negative impact on the environment. In particular (if applicable): a) limit the amount of waste and packaging and handle them in accordance with the regulations, b) ensure that the offered products comply with the applicable environmental regulations (including in terms of energy efficiency/labeling – if applicable), c) ensure that waste generated in connection with supply/mounting/commissioning (if any) is handled in accordance with the regulations, d) on request of the Contracting Authority, submit explanations or documents confirming the fulfillment of the above requirements – adequately to the scope of the contract. 4. The task is co-financed from the funds of the programme Fundusze Europejskie na Infrastrukturę, Klimat, Środowisko 2021–2027 (FENX/FEnIKS), within the framework of the FENX.09.01 action. 5. The Contracting Authority reserves the obligation for the contractor to personally perform the key elements of the contract: a) in part 1–reconstruction of the biological reactor [no. 7] and secondary settler [no. 8] b) in part 2–replacement of the water treatment technological system in wtp c) in part 3–replacement of operational and structural devices in ps 6. The offer, JEDZ, other required documents are prepared in electronic form, sealed with a qualified electronic signature. 7. The contractor may submit one offer for one, several or all parts of the contract. Together with the offer, the Contractor submits documents required by the Act and SWZ, in particular powers of attorney, a commitment of the entity providing resources, a declaration of contractors jointly applying for the award of the contract art. 117.4 Pzp, a declaration regarding the absence of grounds for exclusion resulting from art. 7.1 of the Sanction Act and art. 5k of the Council Regulation (EU) No. 833/2014. 8. The Contracting Authority will exclude the contractor from the procedure in the cases specified in art. 108.1 of the Pzp Act (mandatory grounds for exclusion of the Contractor). The Contracting Authority does not provide for the optional grounds for exclusion specified in art. 109.1 of the Pzp Act. The Contracting Authority will exclude the Contractor from the procedure in the cases specified in art. 5k of the Council Regulation (EU) No. 833/2014 and in art. 7.1 of the Act of 13 April 2022 on specific solutions in the field of counteracting the support of aggression on Ukraine and serving to protect national security. 9. In terms of the absence of grounds for exclusion, the Contracting Authority will require: information from the National Criminal Register in the scope of art. 108.1.1 and 2 of the Pzp Act and art. 108.1.4 of the Pzp Act, a declaration in the scope of art. 108.1.5 of the Pzp Act, a declaration of the Contractor itself on the currency of the information contained in the JEDZ in the scope of the grounds for exclusion. 10. In terms of fulfilling the conditions for participation in the procedure, the Contracting Authority will require the Contractor to provide the following substantive evidence: information from a bank or cooperative savings and credit union confirming the amount of financial resources or the creditworthiness of the Contractor, in a period not earlier than 3 months before its submission; documents confirming that the Contractor is insured against civil liability in the scope of the conducted activity related to the subject of the contract, with the indication of the guarantee sum of this insurance; a list of construction works carried out not earlier than in the period of the last 7 years, and if the period of conducting the activity is shorter – in this period, with the indication of their type, value, date and place of execution as well as entities, for which these works were carried out, and with the attachment of evidence specifying whether these construction works were carried out properly, a list of persons appointed by the Contractor to implement the public contract, in particular those responsible for managing construction works, technology, automation AKPiA and PLC/SCADA programming, along with information on their professional qualifications, authorizations and experience necessary to carry out the contract, the scope of activities performed by them and information on the basis of disposal of these persons; Financial statement and profit and loss account confirming the financial and economic situation. 11. The Contracting Authority requires the submission of a bid bond in the amount of: for part 1: 425,000 PLN; for part 2: 80,000 PLN; for part 3: 85,000 PLN. 12. The Contracting Authority requires a mandatory site visit. 13. The task implementation deadline Part No. 1: by 30.06.2029. Part No. 2: implementation 10 months. Part No. 3: implementation by 30.10.2027. 14. The Contracting Authority requires a guarantee of proper

CPV codes

Construction workEngineering design servicesWater-treatment plant construction workConstruction work for water and sewage pipelinesWastewater treatment plant construction workPurification plant equipmentInstallation of outdoor illumination equipmentRoadworksElectrical installation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders