France – Roadworks – RD135 - Suppression du PN 66 sur la commune de Perrignier et création d'un giratoire sur la RD 135
Description
In the context of the construction of the A412 motorway between Machilly and Thonon-les-Bains, SNCF has been tasked with securing level crossings n°65 and 66 in the commune of Perrignier, which will see an increase in road traffic. These level crossing removal projects involve closing the RD 25 at the level of the PN65 and removing the PN 66 by creating a grade separation on the RD 135. The project led by SNCF involves creating the grade separation structure, the Rail Bridge and a road overpass to restore a communal road. The Department, for its part, is carrying out, under its own project management, a roundabout to connect the RD 135 and the connecting street that serves the Perrignier station, as well as the roadway and equipment of the rail underpass. The main characteristics of the project are: - Demolition; - Earthworks; - Road structure / surfacing - Curbs; - Drainage networks - Acoustic screens; - Vertical and horizontal signage.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Construction work for water projects – REHABILITATION D OUVRAGES D EAU POTABLE
Nîmes Métropole (30)FranceConstruction work for water projectsReservoir construction worksOverhaul and refurbishment workDeadline in 31 daysPublished on Oct 22, 2026
France – Overhaul and refurbishment work – Réhabilitation d'un ensemble immobilier situé au 3/9/15 rue Jacques HILLAIRET à PARIS XII
Fonds de Garantie des Assurances Obligatoires de DommagesFranceOverhaul and refurbishment workFacade workJoinery workDeadline in 29 daysPublished on Oct 22, 2026
France – Building alteration work – Création d'un îlot test d'allotissement dans l'unité centrale de production culinaire (UCPC) du pôle logistique des Hôpitaux Universitaires de Strasbourg situé 10 rue Hannah Arendt à Strasbourg
HUS-Etablissement support du GHT 10FranceBuilding alteration workInstallation of partition wallsFloor laying and covering workDeadline in 26 daysPublished on Oct 22, 2026
France – Surface work for highways – A7 - Entretien des chaussées - Section Mondragon/Piolenc PR 152 à 162 (sens 1&2)
AUTOROUTES DU SUD DE LA FRANCE (ASF)FranceSurface work for highwaysGranules, chippings, stone powder, pebbles, gravel, broken and crushed stone, stone mixtures, sand-gravel mixtures and other aggregatesBitumenDeadline in 18 daysPublished on Oct 22, 2026