Back to search
France – Technical inspection services – Phase candidature - Diagnostics, auscultations et missions d'assistance à maîtrise d'ouvrage en phase études et travaux sur le patrimoine des ouvrages d'assainissement visitables et semi visitables (eaux usées, pluviales et cours d’eau)
Nantes MétropoleFrancePublished on Aug 24, 2026
No deadline givenDescription
Diagnostics, inspections and assistance missions for the client in the design and construction phases for the heritage of inspectable and semi-inspectable sewerage works (wastewater, stormwater and watercourses)
CPV codes
Technical inspection servicesTechnical testing, analysis and consultancy servicesSewer survey services
Documents & submission
AI summary
Sign in for an AI summaryContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Geotechnical engineering services – Accord cadre géotechnique
Direction Interrégionale Services Pénitentiaire de LyonFranceGeotechnical engineering servicesDeadline in 31 daysPublished on Aug 24, 2026
France – Architectural, construction, engineering and inspection services – MISSION DE MAITRISE D'OeUVRE - REHABILITATION DE LA RESIDENCE BEAUBREUIL PISCINE - 19, 21, 23, 25, 27, 29, 31, 33, 35, 37, 39 ALLEE FABRE D'EGLANTINE - 87280 LIMOGES - CERTIFICATION : NIVEAU BBC
Limoges HabitatFranceArchitectural, construction, engineering and inspection servicesDeadline in 51 daysPublished on Aug 24, 2026
France – Construction supervision services – Mission d’Ordonnancement, de Pilotage et de Coordination de chantier (OPC) dans le cadre du projet de rénovation de l’aile 40.06 du bâtiment 40 sur le site du CEA Grenoble
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESFranceConstruction supervision servicesConstruction-site supervision servicesArchitectural, engineering and planning servicesDeadline in 31 daysPublished on Aug 24, 2026
France – Feasibility study, advisory service, analysis – ETUDES POUR RESEAUX D'ELECTRIFICATION, DE RACCORDEMENT ELECTRIQUES ET ECLAIRAGE PUBLIC
REGIE D'ELECTRICITE DE THONESFranceFeasibility study, advisory service, analysisDeadline in 36 daysPublished on Aug 24, 2026