Hungary – Construction work – Zsóry Gyógy- és Strandfürdő fejlesztése
Description
The complete demolition of the dilapidated circular and wave pool complex and the construction of new pools and themed units in its place. The new wave pool will form the main axis of the renewed water world. This will be surrounded by the curved design experience and cascade pools, the "slow and fast river" pool, evoking the shape of the demolished circular pool and also placed in a mirror-symmetric manner. The service building will be located between the wave pool and the "slow and fast river" pool on the southern side of the complex, with its external appearance, color and form fitting into the Matyó thematic concept.
1. Pools
The pool group contains 7 pools:
• Wave pool - water surface: 709 m2, water depth: 0-152 cm, water temperature 28°C
• Seated experience pool (cascade pool) - water surface: 166 m2, water depth: 110 cm, water temperature 32°C
• Standing experience pool (cascade pool) - water surface: 149 m2, water depth: 130 cm, water temperature 32°C
• Adult pool - water surface: 145 m2, water depth: 135 cm, water temperature 30°C
• Slow and fast river - water surface: 213 m2, water depth: 135 cm, water temperature 32°C
• Family experience pool - water surface: 130 m2, water depth: 110 cm, water temperature 32°C
• Family paddling and baby pool: - water surface: 120 m2, water depth: 0-40.3 cm, water temperature 32°C
Three water experience areas have been placed between the pools:
• Fountain
• Splash pad
• Water playground - water surface: 185 m2, water depth: 0-23 cm, water temperature 30°C
Additional facilities:
• Swimming pool equipment building
2. Buffet
The functions set up in the Matyó Buffet Building:
• Dispensing, Storage, Refrigerated storage
• Sound and aroma therapy
• Salt cabin
• Accessible WC
• Water treatment plant building
3. Environment
Environment which includes:
• Traffic routes
• Lawned area
• Pergola shade
The building services of the new complex to be built are as follows:
- Water supply-Sewerage: The drinking water requirement of the building complex will be supplied from cold water wells. For the main building, we plan to supply the hot water separately in two steps with two thermal pumps
- Central heating-cooling, energy supply: The heating requirement of the buildings is realized with the help of water obtained from thermal wells. 1. Heat exchanger capacity: 1138 kW - heating water, 2. Heat exchanger capacity: 293 kW - heating water, 3. Heat exchanger capacity: 496 kW - chemically treated pool water, 4. Heat exchanger capacity: 336 kW - pool water, Utilization of the heat content of the discharged thermal water with 2 water-water heat pumps - heating capacity: 481.7 kW.
- Gas supply
- Artificial ventilation, air conditioning 1 air handler, internal air drying function operated with cold water, Filter: G4, Ventilation airflow: 1000m3/h, Cooling calorifier: tbe=18°C (te/tv=12/17°C)
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Hungary – Heat-transfer station construction work – Távfűtési rendszer infrastruktúra korszerűsítés I.
KECSKEMÉTI TERMOSTAR Hőszolgáltató Korlátolt Felelősségű TársaságHungaryHeat-transfer station construction workDistrict-heating mains construction workDeadline in 31 daysPublished on Oct 29, 2026
Hungary – Electrical installation work – AIR-PRON: BUD állóhelyek infrastruktúra fejlesztés
Budapest Airport Budapest Liszt Ferenc Nemzetközi Repülőtér Üzemeltető Zártkörűen Működő RészvénytársaságHungaryElectrical installation workPower convertersMechanical and electrical engineering servicesDeadline in 44 daysPublished on Oct 29, 2026
Hungary – Sewage-treatment plant construction work – Szennyvíztisztító telep, hálózat, útépítés Dabason
Dabas Város ÖnkormányzataHungarySewage-treatment plant construction workSewer construction workRoad construction worksDeadline in 19 daysPublished on Oct 28, 2026
Hungary – General construction work for pipelines – Alépítményi és helyreállítási munkák
MVM Főgáz Földgázhálózati Kft.HungaryGeneral construction work for pipelinesDeadline in 26 daysPublished on Oct 27, 2026