Skip to content
Back to search

Hungary – Construction work – Zsóry Gyógy- és Strandfürdő fejlesztése

Mezőkövesd Város ÖnkormányzataHungaryPublished on Oct 27, 2026
8 days left

Description

The complete demolition of the dilapidated circular and wave pool complex and the construction of new pools and themed units in its place. The new wave pool will form the main axis of the renewed water world. This will be surrounded by the curved design experience and cascade pools, the "slow and fast river" pool, evoking the shape of the demolished circular pool and also placed in a mirror-symmetric manner. The service building will be located between the wave pool and the "slow and fast river" pool on the southern side of the complex, with its external appearance, color and form fitting into the Matyó thematic concept.

1. Pools

The pool group contains 7 pools:

• Wave pool - water surface: 709 m2, water depth: 0-152 cm, water temperature 28°C

• Seated experience pool (cascade pool) - water surface: 166 m2, water depth: 110 cm, water temperature 32°C

• Standing experience pool (cascade pool) - water surface: 149 m2, water depth: 130 cm, water temperature 32°C

• Adult pool - water surface: 145 m2, water depth: 135 cm, water temperature 30°C

• Slow and fast river - water surface: 213 m2, water depth: 135 cm, water temperature 32°C

• Family experience pool - water surface: 130 m2, water depth: 110 cm, water temperature 32°C

• Family paddling and baby pool: - water surface: 120 m2, water depth: 0-40.3 cm, water temperature 32°C

Three water experience areas have been placed between the pools:

• Fountain

• Splash pad

• Water playground - water surface: 185 m2, water depth: 0-23 cm, water temperature 30°C

Additional facilities:

• Swimming pool equipment building

2. Buffet

The functions set up in the Matyó Buffet Building:

• Dispensing, Storage, Refrigerated storage

• Sound and aroma therapy

• Salt cabin

• Accessible WC

• Water treatment plant building

3. Environment

Environment which includes:

• Traffic routes

• Lawned area

• Pergola shade

The building services of the new complex to be built are as follows:

- Water supply-Sewerage: The drinking water requirement of the building complex will be supplied from cold water wells. For the main building, we plan to supply the hot water separately in two steps with two thermal pumps

- Central heating-cooling, energy supply: The heating requirement of the buildings is realized with the help of water obtained from thermal wells. 1. Heat exchanger capacity: 1138 kW - heating water, 2. Heat exchanger capacity: 293 kW - heating water, 3. Heat exchanger capacity: 496 kW - chemically treated pool water, 4. Heat exchanger capacity: 336 kW - pool water, Utilization of the heat content of the discharged thermal water with 2 water-water heat pumps - heating capacity: 481.7 kW.

- Gas supply

- Artificial ventilation, air conditioning 1 air handler, internal air drying function operated with cold water, Filter: G4, Ventilation airflow: 1000m3/h, Cooling calorifier: tbe=18°C (te/tv=12/17°C)

CPV codes

Construction workSite preparation workWorks for complete or part construction and civil engineering workBuilding installation workBuilding completion work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders