Back to search
France – Restructuring work – CENTRE SPORTIF LA RAMPE - Travaux de réhabilitation globale (tranche 2)
VILLE DE GRENOBLEFrancePublished on Jun 24, 2026
5 days leftDescription
Each lot will be subject to a separate award. The services are paid for by lump sums. - GIMA operation number: WR7736 - Grand Angle operation number: 2007P016O129 - Grenoble City SIRET number: 21380185500015
CPV codes
Restructuring workAsbestos-removal workDemolition workEarthmoving workSite preparation workGuard servicesStructural shell workStructural steel erection work for buildingsWaterproofing workJoinery workScaffolding workStructural steel erection workInstallation of partition wallsNon-metal joinery installation workTiling workLaying work of flexible floor coveringsPainting workLift installation workConstruction work for sports facilitiesElectrical wiring and fitting workHeating, ventilation and air-conditioning installation work
Documents & submission
AI summary
Sign in for an AI summaryContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Wall-covering work – Accord-cadre à bons de commande pour des travaux d'entretien courant de Peinture Revêtements Muraux et Revêtements de sols
OPH de la Haute-SaôneFranceWall-covering workFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Installation of road lighting equipment – Travaux de Génie Electrique sur le territoire de Grand Besançon Métropole
Grand Besançon MétropoleFranceInstallation of road lighting equipmentInstallation of outdoor illumination equipmentDeadline in 33 daysPublished on Sep 08, 2026
France – Wall-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de peinture et revêtements muraux
OPH de la Haute-SaôneFranceWall-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Floor-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de revêtements de sols
OPH de la Haute-SaôneFranceFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026