Skip to content
Back to search

Germany – Architectural, construction, engineering and inspection services – Objektplanung nach Paragraph 34, Leistungsphase 1-5

Landeshauptstadt München, BaureferatGermanyPublished on Feb 03, 2026
No deadline given

Description

Object planning § 34 HOAI LPH 1-5 for general refurbishment and extension to a full-day 4-track primary school according to the standard space programme of the Grundschule am Dom-Pedro-Platz 2, 9th district, Munich Neuhausen-Nymphenburg. Current situation: The Grundschule am Dom-Pedro-Platz 2 is a listed building constructed in solid construction from the years 1899/1900 and is also under ensemble protection. The building consists of a ground floor on the high parterre, two upper floors, a partially converted attic and a basement in the basement. Currently, the school is organised as a 5 ½-track school and is housed in a classic corridor-type layout. The school also contains a sports hall in the attic, a gymnastics room on the 1st floor, and the THV apartment. The playgrounds are located on the school's own property. The outdoor sports facilities of the primary school are located on plot 546/2 on the opposite side of the street and are accessible via Dom-Pedro-Straße. The existing school is to be planned as a 4-track full-day primary school according to the Munich learning house concept. The kitchen and canteen must be upgraded and expanded for this purpose. An extension building as a new building is required for this. In addition, the primary school has numerous structural defects: fire protection defects in the suspended ceilings, maceration on the roof skin, contamination, local moisture problems on external walls, overheating of the single-track sports hall in the attic, supporting structure in the gymnastics room on the 1st floor. To improve the room quality, a retrofit of a new ventilation system in all classrooms is necessary. Furthermore, the ELT technology areas are currently inadequate. It is necessary to create space for ELT technology areas throughout the building. The implementation is to be carried out in one construction section. For this, the entire school will be relocated to another location for the construction period. The organisation of the relocation is not part of the planning. A detailed description of the tasks can be found as a separate attachment.

CPV codes

Architectural, construction, engineering and inspection servicesArchitectural, engineering and planning services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders