Poland – Construction work – „Wykonanie dokumentacji projektowej oraz robót budowlanych dla zadania pn.: "Budowa rozlewiska w leśnictwie Wielki Las"
Description
The subject of the contract is the design, obtaining all the legally required permits and consents necessary to obtain a building permit and commence construction works, the execution of works on the basis of the obtained documents, the execution of a natural inventory before the commencement of construction works and after their completion for the task: "Construction of a retention pond in the Wielki Las forest district" with the following parameters: Area: approx. 5 ha (+- 10%), Water retention capacity: min. 40,000 m3 (for calculations, the amount of surface water in the retention pond and the amount of retained water in the soil should be taken into account), Island area: 0.2 ha (+- 10%) – planned to be carried out in the event of available land on the investment site, Length of the causeway approx. – 90m + 150m = approx. 240 m (to the extent possible, material obtained from the excavation), Execution of channels in the bottom of the retention pond, Slope of the slopes - n = 1:2 - 1:3, Suggested earthworks with reinforced earth overflows, and in justified cases, the arrangement of weirs (sluices): max. 2 units. All design solutions will require the current acceptance of the contracting authority. The obligations of the contractor include, among others: Developing the concept of design solutions and determining the possibilities of obtaining the technical parameters on the basis of the documents received from the contracting authority, Carrying out geological surveys for the entire planned investment area, Reconnaissance of soil and water conditions, with particular consideration of peat deposits and the presence of animal species such as beavers and water voles, Submission to the contracting authority for acceptance of the project concept described in point 2.1. After the acceptance of the design solutions by the contracting authority, the preparation of technical documentation in order to obtain: Notification of the conduct of activities/decision determining the conditions for the conduct of activities – art. 118 of the Construction Law, Water permit (through obtaining a water permit or acceptance of a water permit application or notification of the authority – art. 395a), Building permit, Natural inventory, in an area up to 100 m from the boundary of the implemented object, taking into account protected habitats, protected plant species sites and places of occurrence of protected amphibian and bird species before starting construction works and submission of 1 copy to the contracting authority, including photographic documentation and GPS trace files recorded during the inspection of the object. In the event of the identification of protected animal, plant and fungal species in the natural inventory – deviations from the prohibitions indicated in the Nature Conservation Act – Art. 56. The contractor will transfer to the contracting authority all the decisions obtained - before their legal validity, agreed and prepared (copies or originals) for the submission of any comments on their content within 3 days from the date of their receipt. The contractor will transfer to the contracting authority: All valid decisions, permits and documents described in point 2.4. Project documentation in paper form (2 copies) and electronic form in the format in which the documents were prepared and additionally in .pdf format together with the valid building permit. Water permit with valid Decision – water permit. or confirmation of the acceptance of the relevant water permit application, Technical specification for the execution and acceptance of works 2 copies, Natural inventory 1 copy. The contractor, as part of the construction works: will provide the contracting authority with a schedule for the implementation of the construction works with a breakdown into stages of construction works, in agreement with the contracting authority within 30 days from the date of receipt of the valid building permit, but not later than 360 days from the date of signing this Agreement (or within a shorter period in accordance with the submitted offer). Notify the commencement of works and obtain a construction journal. Carry out the subject of the contract in accordance with the technical documentation, applicable regulations, standards and technical conditions for the execution and acceptance of works, taking into account the protective periods for at least birds, reptiles, amphibians, and plants described as being on the construction site, with the indications of the contracting authority and the principles of technical knowledge and building art, notify the completed works for acceptance by entering them in the construction journal. Will carry out the works ensuring conditions in accordance with the OH&S, fire safety and anti-theft protection regulations, and will assume the obligations of the BHP coordinator. The contractor, based on the risk table, will inform their employees about the risks to safety and health related to the subject of the contract and will submit to the contracting authority written confirmations of the transmission of this information. Maintain the construction site in good order, and after the completion of the works, clean up the site and transfer it to the contracting authority within the time limit set for the acceptance of the works. Will keep a construction journal which is a record of the work carried out. Organize the construction site at its own cost. Conclude an insurance contract for the damages that may occur on the construction site in connection with the specified random events and from civil liability and submit them to the contracting authority. Carry out a post-construction geodetic inventory. Prepare, after the completion of the construction works, a natural inventory, in an area up to 100 m from the boundary of the implemented object, taking into account protected habitats, protected plant species sites and places of occurrence of protected amphibian and bird species before starting construction works and submit 1 copy to the contracting authority, including photographic documentation and GPS trace files recorded during the inspection of the object. Dispose of the earth masses in accordance with the guidelines set out in the letter from RDLP Krosno dated 16.06.2011r. no. ZU-0746-3/26/11. Prepare documents for the notification of the completion of the implementation of the Agreement, notification of the completion of construction works. Obtain a decision on the use of the object from the competent authority. After the completion of the works, transfer the originals of all the decisions obtained. Carry out the works in accordance with the principles of technical knowledge and building art, applicable regulations and standards. The obligations of the contractor include the conduct of author's supervision over the implementation of the investment.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Site-reclamation work – Wykonanie robót wynikających z nałożonego obowiązku ograniczenia oddziaływania na środowisko i jego zagrożenia oraz przywrócenia środowiska do stanu właściwego zachodniej części zwałowiska położonego przy szybie Leon II (decyzji naprawczej) dla PGG S.A. Oddział KWK ROW Ruch Rydułtowy
Polska Grupa Górnicza S.A.PolandSite-reclamation workDeadline in 36 daysPublished on Nov 19, 2026
Poland – Construction work for gas pipelines – Przebudowa gazociągu DN400 MOP 4,22MPa Sędziszów – Tarnów Mościce wraz z odgałęzieniami do stacji gazowych
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.PolandConstruction work for gas pipelinesDeadline in 43 daysPublished on Nov 19, 2026
Poland – Construction work – Przebudowa budynku Urzędu Skarbowego w Krośnie w ramach zadania: „Przebudowa w celu poprawy efektywności energetycznej budynku Urzędu Skarbowego w Krośnie przy ul. Składowej 5”.
Izba Administracji Skarbowej w RzeszowiePolandConstruction workDismantling worksStructures construction workDeadline in 9 daysPublished on Nov 19, 2026
Poland – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Realizacja zadania pn.: „Rewitalizacja Parku Lisiniec w Częstochowie – III etap – Budowa strefy rekreacji Pacyfik w Parku Lisiniec”, polegającego na zaprojektowaniu i wykonaniu robót dla zadania prowadzonego w systemie „zaprojektuj i buduj”.
Gmina Miasto CzęstochowaPolandConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsBuilding demolition and wrecking work and earthmoving workExcavating and earthmoving workDeadline in 23 daysPublished on Nov 19, 2026