Skip to content
Back to search
This tender has been withdrawn.

Germany – Construction work for buildings relating to education and research – Neubau Schulcampus Greifswalder Straße (SCG)

Landeshauptstadt Erfurt - Amt für GebäudemanagementGermanyPublished on Jul 23, 2026
No deadline given

Description

A new school campus is to be built, among other things, on a former commercial site east of Erfurt city centre. The construction site forms the southern boundary of the planned "Greifswalder Straße residential quarter" and is bounded to the east by a future ring road and the railway embankment. A local supplier will be located south of the construction site, and residential buildings of the "Hanseviertel" are located to the west. The three building structures of the sports hall, primary school and secondary school together form the building ensemble of the new school site at Greifswalder Straße. The contiguous building figure closes the block edge of the Greifswalder Straße residential quarter to the south. The building offset divides the plot into three open spaces, and roof overhangs create weather-protected entrance areas and clearly legible addresses. The public path for pedestrians and cyclists, running in a north-south direction, is integrated into the campus access system. The connecting path, together with a forecourt, forms the spatially defined entrance situation of the sports hall and the primary school. The campus concept also continues inside the buildings. Thus, due to the proximity of the two schools to each other, some functional areas can be used jointly. Synergies arise, in particular, in the areas of the auditorium/canteen, parts of the administration and the utility areas. The administrations of both schools are located on the ground floor at the respective facade, which allows a view of the associated schoolyard. Other specialist rooms such as workshops and student kitchen (primary school) or art, music and biology (secondary school) are also located on the ground floor. The respective community areas of the two schools are located opposite each other on the ground floor, with the intervening open space being covered. Thus, joint celebrations and events can also be implemented. In the upper floor of the primary school, apart from the computer room, only the learning worlds with linked differentiation areas are located. Outside of school hours, these spacious rooms are also available for kindergarten use. The uses are distributed in the three buildings as follows:

Building A: Three-court sports hall with a hall size of 45.00 x 22.00 m with ground-floor ancillary rooms: 6 changing rooms, 3 sanitary areas and 3 equipment rooms.

Building B: Primary school for 320 pupils and 30 teachers on 2 floors: Ground floor: canteen, auditorium, student kitchen, workshop and administration. Upper floor: 8 large classrooms ("learning world"), 4 division rooms and a computer room. Basement: Partial area: underground car park.

Building C: Secondary school for 600 pupils and 60 teachers on 3 floors: Ground floor: auditorium, administration, physics, music, art specialist rooms. 1st floor: 12 classrooms, biology and MNT specialist rooms. 2nd floor: 12 classrooms, chemistry and MNT specialist rooms.

All further details can be found in the tender documents.

CPV codes

Construction work for buildings relating to education and research

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders