Skip to content
Back to search
This tender has expired.

Germany – Engineering design services – Technische Planung einer Entladestelle für das Projekt "Langfristige Sicherung der Geschiebezugabe (LSG)" - Standort Iffezheim

Wasserstraßen- und Schifffahrtsamt OberrheinGermanyPublished on Mar 19, 2026
No deadline given

Description

The planning service advertised here includes the technical planning of the unloading point, including the dam crown crossing. The approximately 200 m long and 20 m wide unloading point will be arranged on the Rhine embankment on the right side of the Rhine between Rhine-km 332.5 and 332.7. The unloading point is designed as a rectangular sheet pile wall construction. To ensure the stability of the waterside sheet pile wall (quay wall), anchors to the rear sheet pile wall are likely to be required. For the transport of the retention space material, according to the current planning status, the use of coupled convoys (motor vessel type "Large Rhine vessel with coupled lighter type 'Europa II') is planned. These will moor to the quay wall of the unloading point for the unloading process. No ship towing is planned. The conveyor belt for the dam crown crossing will be guided in a type of trough structure. Since the dam crown must be traversable at any time, a crossing will be needed in the area of the dam crown road. The unloading system is scheduled to operate for 8 years. At the end of this period, the system will be dismantled. Further use of the unloading point as a permanent car transshipment point for inland navigation is to be examined as part of the planning. The fundamental goal of this planning service is the object and structural planning of the unloading point, including the dam crown crossing, up to approval or planning permission (LPH 1 to 4 according to HOAI). The services to be tendered will be awarded in two stages of appointment: - Stage of appointment I – Performance phases 1 and 2 of the object planning and the structural planning for the unloading point and the trough structure or the dam crown crossing, - Stage of appointment II – Performance phases 3 and 4 of the object planning and the structural planning for the unloading point and the trough structure or the dam crown crossing.

CPV codes

Engineering design servicesEngineering design services for the construction of civil engineering works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders