Germany – Architectural, construction, engineering and inspection services – Neubau Campus Zentralklinikum Magdeburg – NCZMD – MSR / GLT (Mess-, Steuerungs- und Regelungstechnik / Gebäudeleittechnik) Planung und Ausführung
Description
The Universitätsklinikum Magdeburg A.ö.R. (UKMD), together with the Medical Faculty (FME) of the Otto-von-Guericke University (OvGU), forms the Universitätsmedizin Magdeburg (UMMD). This merger unites research, teaching (FME) and patient care (UKMD). With approximately 1,100 beds, the Universitätsmedizin is the largest hospital in the city of Magdeburg and the largest medical facility in northern Saxony-Anhalt. The hospital's architectural structure is characterized by decentralization. The main campus, with a total area of approximately 300,000 sqm, is located at Leipziger Straße 44. The Department of Obstetrics and Gynecology, Reproductive Medicine, and the inpatient section of the University Eye Clinic are located at the external site at Gerhart-Hauptmann-Straße 35 (distance as the crow flies approximately 3 km). The main campus is characterized by a pavilion structure. Clinics, outpatient departments, laboratories, logistics, as well as research and teaching are decentralized across the site. In total, there are 26 clinics, 19 institutes, and other independent or affiliated departments distributed across both locations. In addition to research and teaching, the Universitätsmedizin Magdeburg offers the full spectrum of a multi-professional and highly specialized medical maximum care. The entire Universitätsmedizin employs approximately 4,300 staff in research, teaching, patient care, and administration. Additionally, approximately 1,500 students are enrolled in the Medical Faculty, as well as others in the Master's program in Immunology. The current structural layout of the UKMD is characterized by a dislocated building structure, outdated technical infrastructure, long distances, and outdated functional structures. There is an urgent need for action to prepare the UMMD for the future challenges of university medicine and to address pressing structural problems. The new Central Hospital is intended to bring together the previously dislocated clinics and functional units of the Universitätsklinikum in a centralized and functionally optimized structure, thus resolving an outdated situation. Taking into account the existing areas in buildings 60a and 60b, a large part of the clinical areas and a majority of the total usable areas of the UKMD will be located in the Central Hospital complex in the future. The construction of the "New Campus Central Hospital" is the largest construction project in the state of Saxony-Anhalt and is critical to the future viability of the site at Leipziger Straße. The planning and implementation is divided into several individual, interdependent sub-projects. Due to the complexity of the construction measures and the heterogeneous nature of the projects, this is necessary both in terms of content and organization. The current budget for the overall measure is approximately 1 billion €, of which approximately half is allocated to the new construction of the Central Hospital (construction phases 1 and 2). The focus of the building function should be on the harmony of medically up-to-date and future-proof processes, efficient operational structures, and economical solutions. In addition, the following requirements must be strictly considered: - It must be ensured that modern, safe, competitive, and legally compliant healthcare can be provided at the site of the Universitätsmedizin Magdeburg and that current safety risks are minimized. - The planning should be future-proof and innovative. - The highest possible level of automation should be taken into account. - The planning of the Central Hospital must be carried out in such a way that a highly flexible building is created. This flexibility should enable re-use by other medical specialties; possibly as a result of a changed medical strategy. The most complex and medically important project is the new construction of the new central building for inpatient care, which, according to the specifications of the current master plan, directly adjoins the existing buildings 60a and 60b and is intended to form a unit with them. The new central building is a highly complex project in planning, execution, and operation, as well as in the preparation of the procedure, with multifaceted dependencies and a large number of users. It is also challenging to integrate the new building into the existing structures, taking into account existing, partially listed buildings. Due to the complex requirements for the new construction of the Central Hospital, the client, the IPS GmbH, has decided to implement this part of the overall project as an Integrated Project Delivery (IPA). In total, the following IPA partners will be commissioned for planning and execution: Key trade 1: ELT execution: Publication on 19.01.2026 Key trade 2: HLS execution: Publication on 27.01.2026 Key trade 3: TGA planning: Publication on 23.02.2026 Key trade 4: Architectural design including fire protection: Published on 26.02.2026 Key trade 5: MSR/GLT planning and execution: Published on 12.03.2026 Key trade 6: Medical technology planning and execution: Expected publication on 26.03.2026 Key trade 7: Structural engineering: Expected publication on 13.04.2026 Key trade 8: Construction services for interior finishing (GU interior finishing): Expected publication on 27.04.2026 Key trade 9: Construction services for extended rough construction/special foundation engineering (GU extended rough construction/special foundation engineering): Expected publication on 12.05.2026
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Architectural, construction, engineering and inspection services – Erstellung eines hydrologischen Einzugsgebietsmodells für die EZG von Dosse und Jäglitz-Phase III: Erarbeitung von Bewirtschaftungskonzepten und Überführung des Prognosemodells in den Echtzeit-Betrieb
Wasser- und Bodenverband "Dosse-Jäglitz"GermanyArchitectural, construction, engineering and inspection servicesDeadline in 30 daysPublished on Oct 20, 2026
Germany – Engineering design services for mechanical and electrical installations for buildings – Wärmenetz Rottweil
ENRW Energieversorgung Rottweil GmbH & Co. KGGermanyEngineering design services for mechanical and electrical installations for buildingsLoad-bearing structure design servicesQuantity surveying services for civil engineering worksNo deadline givenPublished on Oct 20, 2026
Germany – Architectural, engineering and planning services – Neubau Labor- und Bürogebäude für die Universität Oldenburg Fachplanung Labor (ALG 7)
Land Niedersachen vertreten durch das Staatliche Baumanagement NiedersachsenGermanyArchitectural, engineering and planning servicesArchitectural and related servicesNo deadline givenPublished on Oct 20, 2026
Germany – Engineering services – VgV Aufdimensionierung Hauptsammler Alte Rheinstraße/Eisenbahnstraße
Stadt LahrGermanyEngineering servicesNo deadline givenPublished on Oct 20, 2026