Germany – Building construction work – Elektrodenheizkessel Reick - Los 4.2. Erweiterter Rohbau und Tiefbauleistungen
Description
DREWAG Stadtwerke Dresden GmbH (hereinafter DREWAG), a subsidiary of Sachsen Energie AG, operates the Central District Heating Network (ZFHN) of the city of Dresden. As part of the planned decarbonisation, the share of regenerative heat generation is to be significantly increased. An important component of this are Power-to-Heat plants (P2H plants), which use regeneratively generated electricity for heat generation. Electrodes boilers enable the production of hot water for district heating. Against this background, DREWAG plans to build an electrode boiler plant (EHK plant) for heat generation for the ZFHN at the Heizkraftwerk Dresden-Reick (HKW Re) site. The site offers particularly favourable conditions for the construction and integration of the plant: • existing electrical power supply at medium voltage level • existing connection to the district heating network • use of existing heat storage as a hydraulic buffer • available developable areas and generally feasible approval • synergies in operation and maintenance due to spatial proximity to existing plants and existing operating personnel The project includes the construction of an EHK plant with 2 × 40 MW of electrical power and its integration into the ZFHN. The coupling is indirect via heat exchangers. The existing heat storage system at the site takes on the function of a hydraulic junction between the electrode boilers and the district heating network, thereby decoupling generation and demand in time. Currently, two operating modes are planned: • planned heat generator as part of regular district heat supply • participation in the control energy market (provision of system services), in particular the provision of primary and secondary control power (PRL and SRL) The overall project will be awarded and processed in several lots. The lots include mechanical and process engineering services, technical building equipment (TGA), electrical and control engineering systems, and construction services. The installation of the EHK is scheduled to begin in the 1st quarter of 2028. The subsequent commissioning (IBS) is planned for the 3rd quarter of 2028. The selection competition and the award will be carried out according to criteria which are defined in the tender documents. The complete tender documents (detailed planning) will only be made available to the qualified bidders after the completion of the selection competition.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Track construction works – 27_Rastatt
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)GermanyTrack construction worksDeadline in 13 daysPublished on Nov 11, 2026
Germany – Sanitary fixture installation work – Wasser-, Abwasser- und Gasanlagen für den Neubau des Berufskollegs Meschede
HochsauerlandkreisGermanySanitary fixture installation workWater plumbing workDrain-laying workDeadline in 8 daysPublished on Nov 11, 2026
Germany – Houses construction work – Vergabe von GU-Leistungen für die Sanierung von 5 denkmalgeschützten Gebäuden in Bonn (VOEK 366-25)
Bundesanstalt für ImmobilienaufgabenGermanyHouses construction workRefurbishment workMulti-dwelling buildings construction workNo deadline givenPublished on Nov 11, 2026
Germany – Construction work – BMP A 9 - BW 27_1 Ersatzneubau Bruecke
Die Autobahn GmbH des Bundes - NL SüdbayernGermanyConstruction workConstruction work for highways, roadsConstruction work for bridgesDeadline in 34 daysPublished on Nov 11, 2026