Poland – Construction, foundation and surface works for highways, roads – Budowa drogi Nr 801 w m. Dęblin wraz z budową mostu na rzece Wieprz.
Description
The subject of the investment is the expansion of the provincial road No. 801 on a section approximately 1.0 km long in the localities of Dęblin and Borowa, constituting access roads to the planned bridge over the Wieprz River, along with the necessary accompanying works, implemented as part of the investment intention entitled: "Construction of a bridge over the Wieprz River on the provincial road No. 801 Warsaw – Karczew – Wilga – Maciejowice – Dęblin – Puławy along with the expansion of the access road to the bridge"
2. The scope of the planned investment includes:
a) expansion of the provincial road No. 801 from km 102+854.28 to km 103+855.00,
b) demolition of road elements and infrastructure,
c) demolition of existing public and internal roads (demolition of pavement structure layers, road body, BRD facilities, etc.) not intended for further use,
d) demolition of road embankments partially serving as anti-flood barriers,
e) demolition of the existing bridge structure,
f) construction of a new bridge structure,
g) construction of a new road layout on the road embankment (section of the provincial road), which partially serves as an anti-flood barrier,
h) reconstruction of the municipal road No. 107474L,
i) construction of road embankments, partially serving as anti-flood barriers,
j) construction of pavement structure layers (subbase, surfacing) along with deepening the carriageway of the existing road,
k) construction of a culvert under the crown of the provincial road and a pedestrian-cyclist path,
l) construction of covered drains,
m) construction of road equipment and elements serving road users such as: pedestrian-cyclist path, sidewalk, construction and reconstruction of ramps, lighting, signage and road safety facilities,
n) construction of environmental protection facilities (including a set of replacement ponds for amphibians, herpetological protection),
o) construction of the road body drainage system,
p) green management involving the cutting of trees and shrubs colliding with the investment,
q) planting of greenery,
r) finishing works,
s) execution of vertical, horizontal signage and road traffic safety facilities.
3. The design documentation is adapted to the identified needs of people with disabilities and is in line with the concept of universal design.
4. The contracting authority envisages orders as referred to in Article 214(1)(7) of the Public Procurement Law with a value not exceeding 6 000 000.00 zł net. The scope of the order will include: works listed in point XXVII ppkt 13 SWZ. The conditions under which similar orders will be granted: - Negotiations will be conducted, during which the parties will agree on the detailed scope of the order, the order execution deadline and the remuneration amount, - The contractor of the main order will execute it to the same standard as for the main order. - Granting a similar order will be implemented on the basis of the main agreement.
5. The contracting authority envisages the cancellation of the procedure on the basis of Article 257 Pzp, if the public funds that the contracting authority intended to allocate for the financing of the order have not been granted to it.
6. The contracting authority envisages the requirements indicated in Article 95(1) regarding the employment by the Contractor or subcontractor, on the basis of an employment contract, of persons performing activities, as referred to in point XXVI.1.SWZ in the scope of order implementation.
7. The contracting authority does not allow the possibility of submitting partial offers - a detailed justification is contained in the SWZ.
8. The contracting authority envisages partial payments in accordance with the provisions of the contract project.
9. In accordance with Article 13(1) and (2) of the Regulation of the European Parliament and of the Council (EU) 2016/679 of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (General Data Protection Regulation) (OJ EU L 119 of 04.05.2016, p. 1), further "RODO", I inform that: - the administrator of your personal data is the Director of ZDW in Lublin, ul. Bohdana Dobrzańskiego 3, 20-262 Lublin. - with the data protection inspector of the Road Management Board in Lublin can be contacted via e-mail: Detailed information on RODO can be found in the order documents.
10. The contracting authority, in accordance with Article 139(1) of the Pzp, will first carry out an examination and evaluation of offers, and then carry out a subjective qualification of the contractor whose offer was highest rated.
11. Order execution deadline – up to 24 months from the date of signing the contract. The contractor is obliged to notify the competent building supervision authority of the completion of the construction and to obtain, within the order execution deadline, a certificate from the competent building supervision authority of the lack of grounds for objection to the notification of completion of the construction or a certificate within the order execution deadline - non-objection by the competent building supervision authority (within 14 days from the date of delivery by the Contractor of the notification of completion of the construction) objection by way of a decision (Article 54 of the Act of 7 July 1994 - Building Law). However, in the cases referred to in Article 55(1) of the Act of 7 July 1994 - Building Law, the contractor is obliged to obtain, within the order execution deadline, a permit for the use of the building.
12. The contractor is bound by the offer until 28.11.2026.
13. Bid opening deadline: Bids will be opened on 31.08.2026 at 09:30 on the Platform by decrypting and opening the bids.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Site-reclamation work – Wykonanie robót wynikających z nałożonego obowiązku ograniczenia oddziaływania na środowisko i jego zagrożenia oraz przywrócenia środowiska do stanu właściwego zachodniej części zwałowiska położonego przy szybie Leon II (decyzji naprawczej) dla PGG S.A. Oddział KWK ROW Ruch Rydułtowy
Polska Grupa Górnicza S.A.PolandSite-reclamation workDeadline in 37 daysPublished on Nov 19, 2026
Poland – Construction work for gas pipelines – Przebudowa gazociągu DN400 MOP 4,22MPa Sędziszów – Tarnów Mościce wraz z odgałęzieniami do stacji gazowych
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.PolandConstruction work for gas pipelinesDeadline in 44 daysPublished on Nov 19, 2026
Poland – Construction work – Przebudowa budynku Urzędu Skarbowego w Krośnie w ramach zadania: „Przebudowa w celu poprawy efektywności energetycznej budynku Urzędu Skarbowego w Krośnie przy ul. Składowej 5”.
Izba Administracji Skarbowej w RzeszowiePolandConstruction workDismantling worksStructures construction workDeadline in 10 daysPublished on Nov 19, 2026
Poland – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Realizacja zadania pn.: „Rewitalizacja Parku Lisiniec w Częstochowie – III etap – Budowa strefy rekreacji Pacyfik w Parku Lisiniec”, polegającego na zaprojektowaniu i wykonaniu robót dla zadania prowadzonego w systemie „zaprojektuj i buduj”.
Gmina Miasto CzęstochowaPolandConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsBuilding demolition and wrecking work and earthmoving workExcavating and earthmoving workDeadline in 24 daysPublished on Nov 19, 2026