Germany – Engineering services – VG Bad Breisig - Errichtung eines Feuerwehrgerätehauses in der Ortsgemeinde Waldorf, Los 2: Planungs- und Überwachungsleistungen der Fachplanung Technische Ausrüstung HLS und Elektro
Description
The Verbandsgemeinde Bad Breisig plans to construct a new fire station in the municipality of Waldorf. The currently active fire station in the centre of the municipality will be abandoned. The planned future site is the "Kühhohl" property located at the exit of Waldorf in the direction of Niederzissen, which directly adjoins the state road L82. A plot of approximately 2,500 m² is available for the construction site. The project has been planned with the already approved land-use plan "Feuerwehrgerätehaus Waldorf". The fire station is planned as a combined facility consisting of a vehicle hall, operational yard, social and functional areas, and the necessary outdoor facilities. The vehicle hall is to be equipped with three parking spaces for emergency vehicles according to parking space size 2 in accordance with DIN 14092. With regard to space and area requirements, the current DIN 14092 must be strictly observed. Additionally, a parking space for disaster control and a wash hall are planned. Due to the terrain, the building will probably be two-storey. Construction can be carried out in solid, timber, modular or hybrid modular construction. The facility is to be designed for a personnel strength of around 55-75 active members, of which approximately 40 are male and around 10 are female, plus a youth fire brigade with approximately 20 members. The dimensioning of the changing rooms, sanitary facilities, training rooms and parking spaces for emergency personnel must be based on these personnel numbers. The new fire station will not be permanently manned. The alarm system of the existing fire station will be installed in the new building and possibly expanded. The aim of the project is to construct a modern, functional and future-proof fire station that meets the current legal, technical and organisational requirements and enables safe and efficient fire-fighting operations. A site analysis from 2022 is available and will be provided. The contents are not binding but serve only as a guide for further planning.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Pipeline-design services – Erstellung eines Generalentwässerungsplanes
Stadt Herten - Dezernat 2 - Rechtsamt - ZVGermanyPipeline-design servicesDeadline in 50 daysPublished on Nov 22, 2026
Germany – Landscape architectural services – Neubau Campus Service Center (CSC) und Rückbaumaßnahmen inkl. Baufeldfreimachung am Standort Bei der Hauptfeuerwache 1 in Hamburg - Freianlagen gem. §§ 38 HOAI
GMH | Gebäudemanagement Hamburg GmbHGermanyLandscape architectural servicesNo deadline givenPublished on Nov 22, 2026
Germany – Architectural and related services – Bundesstadt Bonn: Multiprojektsteuerung für die Feuerwachen I und III
Bundesstadt Bonn - Referat VergabediensteGermanyArchitectural and related servicesConstruction project management servicesNo deadline givenPublished on Nov 22, 2026
Germany – Architectural, construction, engineering and inspection services – Nds. Landesarchiv, Pattensen; Anlagengruppen 2, 3 und 8
Land Niedersachsen vertreten durch das Staatliche Baumanagement NiedersachsenGermanyArchitectural, construction, engineering and inspection servicesDeadline in 29 daysPublished on Nov 22, 2026