Belgium – Ground investigation services – Raamovereenkomst met een bodemsaneringsdeskundige voor de opmaak van een technisch verslag voor bodem-en/of waterbodem- en/of asbestonderzoek en een sloopopvolgingsplan 2027 - 2030
Description
This contract involves concluding a framework agreement with a soil remediation expert, recognised as type 1 in accordance with VLAREBO. The contract provides for the execution of soil, groundwater, and asbestos investigations within the framework of VLAREBO on plots located within the Flemish Region. This contract also includes the preparation of a demolition follow-up plan by an expert registered with a demolition management organisation on plots located within the Flemish Region. This is in line with the traceability procedure according to article 4.3.5., § 3 VLAREMA. For this contract, the procedures followed are as mentioned in the standard procedure for the preparation of a demolition follow-up plan and control report. The preparation of a demolition follow-up plan is the first step in the traceability procedure and is required if one wishes to work for the disposal of selectively collected demolition material via a recognised demolition management organisation to achieve a demolition material with a low environmental risk profile. The demolition follow-up plan aims to provide a list of all expected waste materials released during the planned demolition works, as well as to formulate recommendations for selective demolition. Based on a certified demolition follow-up plan, the further traceability procedure as included in the standard procedure for traceability of demolition material via a recognised demolition management organisation can be followed. The contract consists of various sub-contracts, the price of which is calculated on the basis of the unit prices that the tenderer has indicated in the inventory. These sub-contracts can consist of: • technical report on soil, groundwater, and asbestos investigation • demolition follow-up plan
The main contractors for this framework agreement are Agentschap Natuur en Bos and the Vlaamse Landmaatschappij (www.vlm.be). Both Agentschap Natuur en Bos and the Vlaamse Landmaatschappij will annually initiate between 20 and 25 sub-contracts per plot for the preparation of a technical report for soil, groundwater, and asbestos investigation, as well as for the preparation of a demolition follow-up plan within the framework of this framework agreement.
Place of execution: Plot 1 (West Region): - East and West Flanders Plot 2 (East Region): - Flemish Brabant, Limburg and Antwerp
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Belgium – Engineering studies – Opstellen van een nationale roadmap over de duurzame vliegtuigbrandstoffen (SAF) en update van het Belgische State Action Plan
SPF Mobilité et TransportsBelgiumEngineering studiesDeadline in 31 daysPublished on Nov 05, 2026
Belgium – Architectural and related services – Architectuuropdracht voor het bouw- en/of renovatieproject: ‘DE KERSELAAR 2030’
De KerselaarBelgiumArchitectural and related servicesNo deadline givenPublished on Nov 05, 2026
Belgium – Architectural and related services – Nieuwbouw gemeentelijke loods Huldenberg: Ontwerpopdracht voor architectuur, stabiliteit, technieken, omgevingsaanleg, veiligheidscoördinator ontwerp en verwezenlijking en EPB- en ventilatieverslaggeving
Gemeente Huldenberg, bijgestaan door Belfius Bank nvBelgiumArchitectural and related servicesArchitectural, construction, engineering and inspection servicesNo deadline givenPublished on Nov 05, 2026
Belgium – Environmental impact assessment for construction – Désignation d'un prestataire chargé de la réalisation de l'étude d'incidences sur l'environnement (EIE) dans le cadre de l’introduction d’un permis mixte en vue de la construction de l’hôpital des enfants / new hôpital Erasme - pôle critique et chirurgical (HDE/NHE-PCC) sur le site d’Anderlecht
ULB Hôpital ErasmeBelgiumEnvironmental impact assessment for constructionNo deadline givenPublished on Nov 05, 2026