Denmark – Construction work – Skybrudsprojekt i Lersøparken
Description
The project is a construction project and includes a stormwater project located in Lersøparken, covering an area of approximately 95,000 square meters. The purpose of the project is to manage approximately 16,500 m3 of surface water, which is led into the park through HOFOR's pipe solutions in Bispebjerg Bakke and Lygten Canal. On the eastern and western sides of the park, the water is led to the surface through two inlet structures and via channels further down to a wet meadow and a basin with a permanent water level. Lersøparken is protected, and therefore, in connection with the stormwater project, a dispensation from the protection has been granted. The construction work includes the establishment of small structures, inlet structures, channels and a stormwater drain. Inlet structures and channels must be clad with bricks due to the requirements in the dispensation from the protection of the park. The construction work includes terrain regulation in an area with soil of varying degrees of contamination, where mapping has identified areas with heavily contaminated soil. Soil must be handled and disposed of in accordance with the authorities' conditions. Due to the geological conditions in Lersøparken, the construction work includes groundwater lowering in the upper and deep groundwater reservoir. The drainage project mainly consists of the construction of pipes that lead the water from HOFOR's wells at Bispebjerg Bakke to the channels and the basin. The pipes run inside the inlet structures. To make room for the basin, the existing playground is moved, and a new playground is established. This playground, including setup, is a client supply that must be constructed simultaneously with this project. During the construction phase, the southern part of the park will be cordoned off, while the northern part of the park will be publicly accessible. Construction site traffic is expected to use the existing paths with access and exit at Bispebjerg Bakke. The construction period is expected to last 3.5 years with a start in December 2026. As part of the project, masonry work, grass work, structural work for construction and building, and blacksmith work must be carried out. The following is an indication of where the work is described in more detail: Masons must carry out work described in Special Work Descriptions Bridges and Structures in sections 8.2 and 13.1. Grass work is described in Special Work Descriptions in sections 2.3.4, 2.3.4, 2.3.4.3, 2.3.4.7, 2.5.1, 2.5.2, 2.5.3 and 2.5.5. Structural work for construction and building is described in Special Work Descriptions Bridges and Structures in sections 20, 21, 22, 24, 25 and Special Work Descriptions in sections 3.5.1, 3.5.2, 3.5.5 and 3.5.6. The blacksmith must carry out work described in Special Work Descriptions Bridges and Structures in sections 36, 40 and Special Work Descriptions 3.5.3. The above is hereinafter referred to as "The Project". The Project is carried out as a main project. Reference is made to the tender material, which contains a more detailed description of the task and tender process, and the remaining material contains a description of the scope of the task. The project sees a number of potentials for optimization of execution, including e.g. methods, quantities and schedule. Therefore, a bonus is given for optimization of the project. The bonus provision and the conditions herefor appear from the project agreement's point 9.2.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Denmark – Transformer substation – Etablering af ny 150 kV Højspændingsstation, Hornbæk - 19/08517
Energinet Eltransmission A/SDenmarkTransformer substationDeadline in 54 daysPublished on Nov 19, 2026
Denmark – Construction work – Udbud af ret til at virke som ladeoperatør af offentligt tilgængelige ladepunkter i Gentofte Kommune (Genudbud)
Gentofte KommuneDenmarkConstruction workMains connectionsElectrical equipment and apparatusDeadline in 25 daysPublished on Nov 19, 2026
Denmark – Construction work – Renovering af afdeling 11 Kapellanvej 25-35 og 34-36 og afdeling 13 Taarnvang 1 - 19 og 6 – 22, Holbæk
Byggeforeningen af 1933 (”BYG33”)DenmarkConstruction workNo deadline givenPublished on Nov 19, 2026
Denmark – Electrical installation work – Rammeaftale for Elektronisk og Mekanisk Sikring
Etablissement- og TerrænkommandoenDenmarkElectrical installation workBurglar and fire alarmsVideo-surveillance systemDeadline in 29 daysPublished on Nov 19, 2026