Skip to content
Back to search

Germany – Architectural, engineering and planning services – Sanierung Hallenbad Essern - Fachplanung Technische Gebäudeausstattung

Samtgemeinde UchteGermanyPublished on Nov 18, 2026
7 days left

Description

The Essern swimming hall, constructed in 1971, is used year-round – except during the summer holidays – by clubs, a primary school, the DLRG, and a company, particularly for swimming lessons and health and rehabilitation services. The building and its equipment are largely outdated and require significant renovation. The revised concept envisages an extension of approximately 45 m². Planned are a separate entrance, a barefoot walkway, showers, and barrier-free changing, WC, and shower areas. The existing tiled pool will be preserved through joint sealing and additionally made accessible via a pool lift. The swimming pool, ventilation, and building technology, lighting, windows, radiators, and flat roof will be renewed or renovated. A heat pump, photovoltaic system, and LED lighting are to save energy and reduce the swimming pool's electricity demand by around 20%. Completion is scheduled for 31.03.2028. The swimming pool will remain closed during the construction phase.

CPV codes

Architectural, engineering and planning services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders