Írország – Építési munkák – Mary Immaculate College - Summerville Lodge and Small Mount Building Works
Descripción
SUMMERVILLE LODGE - The removal of all loose furniture and fitted furniture to be stored in a container on site (location to be agreed on site). Removal of all plaster to highlighted areas and replaced with a new special dry lining system. Removal and re-fitting of all fitted shelving and storage units then full decorations to all walls and ceiling including re-glossing of all woodwork. All furniture to be reinstalled. SMALL MOUNT - The removal and replacement of all doors and windows both internally and externally. Remove and replace all floor coverings, architraves, skirting boards, remove and re-fit all sanitaryware to facilitate works. Remove all external wall plaster/wall linings and replace with new insulated wall lining system with full redecorations throughout. New insulated walkway system in attic space to facilitate new ME requirements. New ceilings and loft insulation. ME as per Engineers requirements
Códigos CPV
Documentos y presentación
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Licitaciones relacionadas
Írország – Gépészeti szerelések – National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Reserved Specialist | Mechanical
Office of Public Works (OPW)IrlandaMechanical installationsMechanical engineering installation worksNo se ha dado fecha límitePublicado el 30 jul 2026
Írország – Villamos szerelési munka – National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Reserved Specialist | Electrical
Office of Public Works (OPW)IrlandaElectrical installation workNo se ha dado fecha límitePublicado el 30 jul 2026
Írország – Építési munkák – Carra Mor Community Dwelling, Lifford, Ennis, Co. Clare – Extension, Refurbishment, Heating System Upgrade and Associated Site Works
CorlannIrlandaConstruction workVencimiento en 33 díasPublicado el 30 jul 2026
Írország – Felvonó szerelése – National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Reserved Specialist | Lift (Vertical Transport)
Office of Public Works (OPW)IrlandaLift installation workNo se ha dado fecha límitePublicado el 30 jul 2026