Retour à la recherche
Ce marché a expiré.
Ireland – Construction work for school buildings – Project C1206 - Category 5 - Climate Action and Science Labs - including Gas Works at Colaiste Dun Iascaigh Eircode E21 NV38
Tipperary Education and Training Board_1284IrlandePublié le 15 juin 2026
Délai dépasséDescription
Project C1206 Contractor Services with PSCS for Category 5 - Climate Action and Science Labs - including Gas Works at Colaiste Dun Iascaigh Cashel Road Cahir Co Tipperary E21 NV38 Roll Number 76063D
Codes CPV
Construction work for school buildingsMechanical installationsMechanical engineering installation worksInstallation services of electrical and mechanical equipment
Documents et soumission
Résumé AI
Connectez-vous pour un résumé AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Marchés similaires
Ireland – Construction work – C1230 Invitation to Tender for a Mechanical and Electrical Contractor (inclusive of PSCS) - Gas Upgrade Works at Coláiste Mhuire Co-Ed, Castlemeadows, Thurles, Co. Tipperary, E45 W678
Tipperary Education and Training Board_1284IrlandeConstruction workConstruction work for school buildingsMechanical installationsDélai dans 24 joursPublié le 05 oct. 2026
Ireland – Construction work – De La Salle College Dundalk, Co. Louth
De La Salle College DundalkIrlandeConstruction workSecondary school construction workSpecial school construction workDélai dans 20 joursPublié le 05 oct. 2026
Ireland – Construction work – Electrical Infrastructure Upgrade Works and Establishing a Framework Agreement at St James's Hospital
St James's HospitalIrlandeConstruction workRepair and maintenance services of electrical distribution equipmentElectrical installation work of electrical distribution apparatusDélai dans 30 joursPublié le 05 oct. 2026
Ireland – Roadworks – DCC Contract for Construction of the Coolock to Clontarf Active Travel Scheme Section 2 – Gracefield Road to Vernon Avenue
Dublin City CouncilIrlandeRoadworksRoad construction worksRoad junction construction workDélai dans 21 joursPublié le 05 oct. 2026