Passer au contenu
Retour à la recherche

Ireland – Site preparation work – Ground Penetrating Radar Survey at Abbey Bridge

Limerick City and County Council_103432IrlandePublié le 15 nov. 2026
13 jours restants

Description

The primary objective of the GPR Survey is to produce a duct layout of the post tensioned main span of the bridge. It is expected the entire bridge deck will be scanned from the top.

Codes CPV

Site preparation workStructures of bridgesSurvey conduction servicesSurvey analysis services

Documents et soumission

Résumé AI
Connectez-vous pour un résumé AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Marchés similaires