Passer au contenu
Retour à la recherche

Pologne – Travaux de construction de bâtiments destinés aux institutions d'ordre public ou aux services de secours et de bâtiments militaires – KPP Kołobrzeg – budowa nowej siedziby

Komenda Wojewódzka Policji w SzczeciniePolognePublié le 26 oct. 2026
10 jours restants

Description

1. Construction of the County Police Headquarters building in Kołobrzeg along with ancillary buildings (administrative building, building for police dog handlers with ancillary facilities and exercise area, garage building with shooting range and immediate shelter places (MDS), carport, facility for power generator and warehouse, dumpster, photovoltaic installation, wind turbine and antenna mast on the roof of the administrative building with height of 32 m. a) Assumed parameters of the designed administrative building: - height: 11.87 m, - built-up area: 1 210.12 m², - usable area: 3 663.17 m², - number of floors: 3 above ground, 1 below ground, partially basement building. b) Assumed parameters of the designed building for dog handlers with ancillary facilities: - height: 4.05 m, - usable area (without exercise area): 147.37 m², - number of floors: 1. c) Assumed parameters of the designed building with shooting range and immediate shelter place (MDS): - height: 5.75 m, - usable area: 735.27 m², - number of floors: 1 above ground, 1 below ground (MDS - usable area 249.4 m²), d) Assumed parameters of the carports: - carport for 10 spaces with usable area 241.60 m² - carport for 5 spaces with usable area 140.64 m², e) Photovoltaic installation located on the plot with a power of ~100kWp, f) air-water heat pump installation, g) wind turbine – 1 unit, h) land development: - built-up area: 2 362.06 m², - hardened area (internal roads, parking spaces, walkways): 7 521.72 m², - biologically active land area: 5 176.43 m², i) Execution of construction works including land development, including inter alia: - connections: water supply, sanitary and storm sewerage, electrical, telecommunication sewerage, - external installations on the Investor's plot: water supply, sanitary sewerage, storm sewerage, electrical, telecommunication sewerage, fire-fighting tank, - access roads, parking spaces, walkways, - fence with sliding gates and pedestrian gates with a height of 2.00-2.20 m, with metal elements - 276.51 ml, masonry - 101.08 ml, - bollards, - place for storage and segregation of solid waste. The contracting authority requires that the construction works be carried out with new materials with parameters specified in the detailed technical specifications for all sectors. A detailed description and scope of work is contained in the documentation constituting Annex 2 to the SWZ. 2. Detailed requirements regarding the acceptance, warranty conditions and payment of the subject of the order have been specified in the provisions of the contract constituting Annex 6 to the SWZ.

Codes CPV

Construction work for buildings relating to law and order or emergency services and for military buildingsBuilding demolition and wrecking work and earthmoving workSite preparation workConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkSolar photovoltaic modulesSolar installationWind farmLow-voltage installation workElectrical wiring workElectrical installation workInstallation of outdoor illumination equipmentFire-alarm system installation workBurglar-alarm system installation workRadio aerial installation workInstallation of telephone exchangesLocal area networkPlumbing and sanitary worksHeating, ventilation and air-conditioning installation workConstruction work for water and sewage pipelines

Documents et soumission

Résumé AI
Connectez-vous pour un résumé AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Marchés similaires