Passer au contenu
Retour à la recherche

Pologne – Travaux de construction – 1. Budowa Muzeum Westerplatte i Wojny 1939 – Oddziału Muzeum II Wojny Światowej w Gdańsku – zakres 2

Muzeum II Wojny Światowej w GdańskuPolognePublié le 27 août 2026
17 jours restants

Description

1. Construction of the Museum of Westerplatte and the War of 1939 – Branch of the Museum of the Second World War in Gdańsk” – scope 2. The subject matter of the contract covers the execution of construction works and the completion of the construction procedure, as referred to in Section 5c of the Construction Law (i.e. Dz. U. 2025 poz. 418 ze zm.) [hereinafter the Construction Law] for the investment task covering the implementation of scope II of the investment named „Construction of the Museum of Westerplatte and the War of 1939 – Branch of the Museum of the Second World War in Gdańsk – scope 2”. 1.1. The material scope of the contract covers all works, activities and tasks necessary for the implementation of the investment task, including the following elements: • Construction of a two-storey, underground Main Museum Building with a usable area of 7 051.54 m², • Construction of a fire road with a manoeuvring area for a fire truck, • Reconstruction of historical communication routes, • Reconstruction of the historical position of the cannon, • Reconstruction of the relic of the Popielnik, • Conservation renovation of objects: Monument to the Defenders of the Coast, Guardhouse No. 3, southern wing of the New Barracks – permanent ruin, Monument to the 7 Torches, • Clarification of the outlines of the objects: Mikołajewo, NCO's Villa, northern wing of the New Barracks, Old Barracks, NCO's Casino, Monument to the 10th Anniversary of Regaining Independence, • Conservation of the existing inscription „Nigdy więcej wojny”, • Execution of small architecture elements, • Demolition of objects: including reinforced concrete nests of the open-air exhibition, elements of the IS-2 tank, ahistorical communication routes, ahistorical land stairs, ahistorical buildings, reinforced concrete canopy and sales pavilion, southern parking, flagpoles, concrete information boards, steel stands, small architecture elements, • Tree felling and execution of replacement plantings, • Construction and reconstruction of external networks, • completion of the construction procedure, as referred to in Section 5c of the Construction Law. 2. The subject of the contract is described in detail in Annex No. 1 to the SWZ „Description of the subject of the contract” (DZO) and in the technical design documentation (constituting Annexes 1 to 4 to the DZO), as well as the contract template constituting Annex No. 7 to the SWZ. 3. The Contractor will provide a minimum 60-month guarantee for the subject of the contract, from the date of signing the final acceptance protocol. In addition to the guarantee given, the Contractor shall be liable for a period of 5 (five) years for defects in the performance of the Works, which are the subject of the Contract, on the basis of Article 638 of the Civil Code in connection with Article 656 of the Civil Code in connection with Articles 556-576 of the Civil Code. 4. The Contractor, whose offer is selected as the most advantageous, will be obliged to have: • current civil liability insurance for the activity carried out related to the subject of the contract in the amount of insurance not less than 50,000,000 PLN for the entire period of the contract (until the completion and acceptance of the works); • current insurance of all construction and assembly risks / CAR insurance, EAR insurance, the subject of which will be the contractual works, which includes the value of the construction works carried out in the amount not less than the net value of the offer and all materials, construction equipment with the construction site, as well as any property existing, located on the construction site and in its vicinity, with the insurance period starting from the date of handover of the construction site/land until the end of the contractual works, confirmed by the final acceptance. 5. Due to the limited number of characters that can be entered into the announcement content form, the remaining information is contained in the SWZ, available together with this announcement on the website of the conducted procedure.

Codes CPV

Construction workSite preparation workSite preparation and clearance workTheme park construction workMuseum construction workUnderground work other than tunnels, shafts and subwaysFoundation workPile drivingTrench sheeting workDiaphragm wall techniqueConcrete workBuildings of particular historical or architectural interestWorks for complete or part construction and civil engineering workBuilding completion workHire of construction and civil engineering machinery and equipment with operatorOverhaul and refurbishment workElectrical wiring workElectrical fitting workLightning-protection worksConstruction work for electricity power linesHeating, ventilation and air-conditioning installation workPlumbing and sanitary worksConstruction work for water and sewage pipelinesConstruction work for communication linesFire-alarm system installation workBurglar-alarm system installation workInstallation of computer cablingAlarm system and antenna installation workInstallation of cable infrastructureDemolition workSiteworksLandscaping workAssembly of metal structuresStructural steelworksVarious surface worksReinforced-concrete structuresRoad construction worksBuilding installation work

Documents et soumission

Résumé AI
Connectez-vous pour un résumé AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Marchés similaires