Írország, Görögország – Építési munkák – Retender - Restoration and Extension of Stone Cottage, Demolition of Two Stone Outbuildings, and Installation of New WWTS
Description
The works consist of - Demolition of stone shed and block lean-to extension. - Refurbishment of old stone cottage – the cottage requires a new ground bearing floor slab and a new roof, the existing rubble stone walls will have to be raked out and repointed on the outside and plastered with insulating lime based plaster on the inside. The cottage needs all new windows and doors and full internal fitout. - Construction of a new 64m2 single storey extension - External site works – all site drainage and construction of a patio - Construction of a new Waste Water Treatment System
Codes CPV
Documents et soumission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Marchés similaires
Írország – Gépészeti szerelések – Upgrade of LPG Fire, Sectional Cast Iron Boilers in Coláiste Mhuire, Johnstown, Co Kilkenny
Kilkenny and Carlow ETBIrlandeMechanical installationsMechanical engineering installation worksInstallation services of mechanical equipmentDélai dans 17 joursPublié le 30 août 2026
Írország – Előre gyártott egységek – Supply, Delivery, Installation and Commissioning of Five Modular Buildings comprising Three Guest Accommodation Cabins, One Recreational Cabin and One Utility/Plant Building at Garranty, Inishturk Isl
Augustine O'TooleIrlandePrefabricated unitsAssembly and erection of prefabricated structuresBuilding completion workDélai dans 28 joursPublié le 30 août 2026
Írország – Szakiskola építése – GRETB - Architectural Services for new modular build at GRETB, Boyle VTOS Centre, Lower Marian Road, Boyle, Co Roscommon, F52 X580
Galway Roscommon Education and Training Board_92189IrlandeVocational college construction workModular and portable buildingsConstruction work for college buildingsDélai dans 25 joursPublié le 30 août 2026
Írország – Építési munkák – St.Columcille's Hospital - Water Metering and Monitoring Project
Health Service Executive (HSE)IrlandeConstruction workDélai dans 21 joursPublié le 27 août 2026