Írország – Hidak építési munkái – Galway City Council Bridge Remediation Salmon Weir Bridge
Description
The scope of the proposed remedial works is summarised briefly as follows: • Site set-up; • Installation of water quality protection measures; • Traffic management; • Site clearance including vegetation clearance from embankments adjacent to the bridge; • Removal of all vegetation and algae from stonework faces; • Graffiti removal; • Cleaning of stonework (specialist mild abrasive blast system appropriate to protected structures); • Masonry Repairs (high quality sympathetic repairs by historic structure specialist mason); • Masonry Repointing of Joints (by historic structures specialist); • Repair of existing concrete scour aprons; • Parapet Balusters (in-situ repairs, surface prep and repainting); • Replacement of Heritage Lamp Standards and Lantern Heads; • Electrical works associated with Heritage Lighting; • Breakout of existing footpaths and construction of new footpaths; • Planing out existing road pavement and undertaking road pavement inlay; • Provision of new parapet architectural striplighting and associated electrical works; • Surface preparation and maintenance painting of existing watermain running along the southern elevation of the bridge. Galway City Council reserves the right to add additional contracts to this competition over the next few years 4 years with the an estimate spend of €2.5m.
Codes CPV
Documents et soumission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Marchés similaires
Írország – Oktatással és kutatással kapcsolatos épületek kivitelezése – Proposed extension to existing school building including carpark and set down facilities, and all associated site development works at Scoil Naisiunta Mhuire Bainrioghan, Dunkerrin, Birr, Co. Offaly
Scoil Muire Bainrioghan (Dunkerrin NS)IrlandeConstruction work for buildings relating to education and researchConstruction work for school buildingsPrimary school construction workDélai dans 25 joursPublié le 03 sept. 2026
Írország – Épületszerelési munka – Fire Remediation Works at Rowantree Court, Mullaghmonaghan, Monaghan
Oaklee HousingIrlandeBuilding installation workBuilding completion workFireproofing workDélai dans 34 joursPublié le 03 sept. 2026
Írország – Építési munkák – Curlew Road Helthcare Campus, Drimnagh, Dublin 12
Health Service Executive (HSE)IrlandeConstruction workAucune date limite donnéePublié le 03 sept. 2026
Írország – Építési munkák – building extension project at Scoil Mhuire Agus Iosaf, Collooney, Co. Sligo.
Scoil Mhuire Agus IosafIrlandeConstruction workPrimary school construction workDélai dans 30 joursPublié le 03 sept. 2026