Séim le haghaidh an ábhar
Ar ais go lorg

Málta – Construction work – Restricted Procedure for the manufacture and laying of 2 x 33 kV Three-Core Submarine Power Cables with embedded FO cable between Malta and Gozo

Enemalta plcMáltaFoilsithe ar 30 MFómh 2026
Níl deireadh aon áit

Cur síos

An t-áidhchiall ar an iarratas seo ná a bheith ag baint le ceannairc a dhéanann agus a chur dhá chábail 33kV faoi thalamh le cabáil Fíbrithe Optaice curtha isteach eatarthu idir Malta agus Gozo.

Códanna CPV

Construction workHigh voltage installation workWorks for complete or part construction and civil engineering work

Dátaí & iontráil

Coimriú AI
Logáil isteach don saorán AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Tairiscintí gaolmhara