Înapoi la căutare
Málta – Kikötőépítés – IMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Infrastructure MaltaMaltaPublicat pe 27 aug. 2026
33 zile rămaseDescriere
IMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Coduri CPV
Harbour construction worksQuay construction workQuay wall construction workMarine construction worksWharf construction workElectricity supply installationsEngineering works and construction worksStorm-water piping construction workInfill and land-reclamation workInstallation of port lighting equipmentReinforced-concrete workPilingSheet piling
Documente și transmitere
Rezumat AI
Conectează-te pentru un rezumat AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Achiziții similare
Málta – Vízi létesítmények építése – WSC/T/064/2026 - WORKS - DESIGN, BUILD, COMMISSIONING AND TRANSFER OF NEW PLANT B AT GHAR LAPSI REVERSE OSMOSIS PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION
Water Services CorporationMaltaConstruction work for water projectsDesalination apparatusFiltration plant equipmentTermen limită în 62 zilePublicat pe 27 aug. 2026
Málta – Építési munkák – WSC/T/058/2026 - WORKS - DEVELOPMENT OF SEA WATER BOREHOLES AT HONDOQ (GOZO) REVERSE OSMOSIS PLANT FOR THE WATER SERVICES CORPORATION
Water Services CorporationMaltaConstruction workWell-drilling servicesWell-drilling and production servicesTermen limită în 31 zilePublicat pe 27 aug. 2026
Málta – Építési munkák – WSC/T/050/2026 - WORKS - DEVELOPMENT OF SEA WATER BOREHOLES AT GHAR LAPSI REVERSE OSMOSIS PLANT FOR THE WATER SERVICES CORPORATION
Water Services CorporationMaltaConstruction workWell-drilling servicesWell-drilling and production servicesTermen limită în 31 zilePublicat pe 27 aug. 2026
Málta – Építési munkák – CT2328/2026 - Works - Supply, Delivery, Installation and Commissioning Of Three (3) Environmentally Friendly Temporary Modular Containerised Office Facilities At Mater Dei Hospital.
Department of ContractsMaltaConstruction workPost office construction workWorkshops construction workTermen limită în 27 zilePublicat pe 19 aug. 2026