Poland – Construction work for power plant – Wykonanie robót budowlanych w formule zaprojektuj i wybuduj: Projektowanie, dostawa i budowa :instalacji fotowoltaicznej pn. PV Skalin 1 o mocy zainstalowanej do 5,61MW;instalacji fotowoltaicznej pn.PV Gryfice 2 o mocy zainstalowanej do 9MW; Projektowanie, dostawa i budowa Magazynu Energii Elektrycznej pn.ME Skalin 1 o mocy zainstalowanej 4,472MW; ME Gryfice 2 o mocy zainstalowanej8,944MW
Description
The subject of the order is the comprehensive implementation of the task entitled: „Design, supply and construction of the photovoltaic installation named PV Skalin 1 with an installed capacity of up to 5,61 MW; 2. Design, supply and construction of the photovoltaic installation named PV Gryfice 2 with an installed capacity of up to 9 MW; 3. Design, supply and construction of the Electric Energy Storage named ME Skalin 1 with an installed capacity of 4,472 MW; 4. Design, supply and construction of the Electric Energy Storage named ME Gryfice 2 with an installed capacity of 8,944 MW”. The subject of the order includes 4 tasks for the execution of construction works in the design and build formula: Task 1: „Design, supply and construction of the photovoltaic installation named PV Skalin 1 with an installed capacity of up to 5,61 MW”, financed under the National Reconstruction and Resilience Plan (KPO), G3.1.4. „Support for the national energy system (Energy Support Fund)”. Task 2: „Design, supply and construction of the photovoltaic installation named PV Gryfice 2 with an installed capacity of up to 9 MW” financed under the National Reconstruction and Resilience Plan (KPO), G3.1.4. „Support for the national energy system (Energy Support Fund)”. For Task 1 and 2, the subject of the order is the comprehensive execution of construction and electrical works as well as the necessary design works in the scope of design, redesign, and construction and supply of photovoltaic installations: „PV Skalin 1” with an installed capacity of up to 5,61 MW and „PV Gryfice 2” with an installed capacity of up to 9 MW along with the construction of cable lines SN along with fibre optic lines. Task 3: „Design, supply and construction of the Electric Energy Storage named ME Skalin 1 with an installed capacity of 4,472 MW”, for which a grant agreement for the implementation of the Investment named „Energy Storage: Skalin and Gryfice 2” has been signed from the funds of NFOŚiGW collected in the Modernisation Fund. Task 4: „Design, supply and construction of the Electric Energy Storage named ME Gryfice 2 with an installed capacity of 8,944 MW”, for which a grant agreement for the implementation of the Investment named „Energy Storage: Skalin and Gryfice 2” has been signed from the funds of NFOŚiGW collected in the Modernisation Fund. For Task 3 and Task 4, the subject of the order is the implementation of the investment project consisting of the construction of electrical energy storages (hereinafter: EES) along with internal cabling as well as the necessary infrastructure and installations, accompanying systems and connection to the newly designed 15/0,8 kV substations. The storages will cooperate with the newly designed installations (Task 1 and 2). Construction of the electrical energy storage ME Skalin 1 and ME Gryfice 2 with a total capacity of 13,416 kW and capacity of 26,832 kWh. The installations will consist of: EES Skalin 1 • 2 units of storage with a rated power of 2,236 kW and capacity of 4,472 kWh each, integrated with the newly designed photovoltaic farm PV Skalin 1 with a capacity of 5,61 MW. The storages will function as a hybrid installation, as according to the obtained connection conditions, it can also draw electrical energy from the grid. The energy storage will be connected to the newly designed containerised transformer station. EES Gryfice 2 • 4 units of storage with a rated power of 2,236 kW and capacity of 4,472 kWh each, integrated with the newly designed photovoltaic farm PV Gryfice 2 with a capacity of 9 MW. The storages will function as a hybrid installation, as according to the obtained connection conditions, it can also draw electrical energy from the grid. The storage will be connected to the newly designed transformer stations SN/nN. The designed energy storage systems Skalin 1 and Gryfice 2 will be located on the territory of the designed PV farms – in the immediate vicinity of the designed transformer stations. The designed locations will have guaranteed access to electrical, road and service infrastructure. The area will be fenced, monitored and excluded from general public use.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Realizacja zadania pn.: „Rewitalizacja Parku Lisiniec w Częstochowie – III etap – Budowa strefy rekreacji Pacyfik w Parku Lisiniec”, polegającego na zaprojektowaniu i wykonaniu robót dla zadania prowadzonego w systemie „zaprojektuj i buduj”.
Gmina Miasto CzęstochowaPolandConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsBuilding demolition and wrecking work and earthmoving workExcavating and earthmoving workDeadline in 24 daysPublished on Nov 19, 2026
Poland – Construction work for waterways – Tor wodny na rzece Elbląg na odcinku od punktu P1 do punktu Port
Dyrektor Urzędu Morskiego w GdyniPolandConstruction work for waterwaysRiverbank protection worksRiver regulation and flood control worksDeadline in 4 daysPublished on Nov 19, 2026
Poland – Construction work for gas pipelines – Przebudowa gazociągu DN400 MOP 4,22MPa Sędziszów – Tarnów Mościce wraz z odgałęzieniami do stacji gazowych
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.PolandConstruction work for gas pipelinesDeadline in 44 daysPublished on Nov 19, 2026
Poland – Construction work – Odbudowa infrastruktury wodno-kanalizacyjnej uszkodzonej przez powódź na obszarze Gminy Kłodzko.
"Wodociagi Gminy Kłodzko" sp. z o.o.PolandConstruction workEngineering design servicesWater-treatment plant construction workDeadline in 16 daysPublished on Nov 19, 2026