Germany – Electricity, heating, solar and nuclear energy – Lieferung von elektrischer Energie Ökostrom für diverse Abnahmestellen von Trägern öffentlicher Verwaltungen im Bundesland Schleswig-Holstein
Description
The subject of the tender is the supply of electrical energy (100% green power) as a full power supply for the intake points of the contracting authority as designated in the tender documents. The power supplied to the intake points must be 100% from renewable energy sources. Green power, for the purposes of this tender, is power generated from renewable energy sources. Permissible energy sources include, in particular: hydropower including wave, tidal, salinity gradient and current energy, wind energy, solar radiation energy, geothermal energy, biomass including biogas, landfill gas and sewage gas, and the biologically degradable portion of waste from households and industry. Where power from biomass is used, the relevant legal requirements for the energy carriers used, and, where applicable, the legal sustainability requirements, must be met. Power from nuclear energy and power generated from fossil energy sources, in particular coal, natural gas or mineral oil, does not meet the requirements of this tender. This also applies to power from combined heat and power plants, where this is generated using fossil energy sources.
The tender comprises a total of 2 lots with approx. 499 intake points and an annual total consumption of approx. 4.3 GWh. The intake points of the participants were distributed by the contracting authority into 2 lots.
The actual consumption during the delivery period may deviate from the determined consumption based on the consumption data for the reference year due to usage. The number of consumption facilities may also vary during the contract period. For further details, refer to the preliminary remarks on the power supply contract.
Tolerance range: For the delivery year 2027, a tolerance range of ± 10% of the total reference quantity applicable to each contracting authority applies. The minimum intake quantity at the agreed delivery conditions is 90% of the total reference quantity of the delivery year 2027 per contracting authority. The maximum intake quantity at the agreed delivery conditions is 110% of the total reference quantity of the delivery year 2027 per contracting authority. The actual consumption quantities of all intake points of the respective contracting authority registered for supply in the delivery year 2027 are considered together for the examination of the tolerance range. If there are different price or metering groups within a contracting authority, their consumption quantities are combined for the examination of the tolerance range. Consumption deviations within the tolerance range do not result in separate additional or reduced quantity billing. Separate additional or reduced quantity billing can only be carried out for consumption quantities that lie outside the tolerance range defined above. For details on additional and reduced quantity billing, refer to Section 10 of this specification. The tolerance range is examined separately for each participant. The sum of the actual consumption quantities of all intake points of the respective participant registered for supply in the delivery year 2027 in relation to its total reference quantity is decisive. No balancing of additional or reduced consumption between different participants of the same lot takes place.
The maximum quantity of energy that can be drawn is 150% of the total reference quantity applicable to each contracting authority for the delivery year 2027. Irrespective of this, the absolute maximum quantity of energy that can be drawn within the respective lot is 150% of the total reference quantity shown for the relevant lot. The quantity range between 110% and 150% of the respective total reference quantity does not belong to the tolerance range and is billed according to the regulations for additional quantity billing. The above maximum quantities do not constitute an obligation on the contracting authority to take delivery. An obligation to take delivery exists solely in accordance with the regulations on the tolerance range and the other contractual provisions. Once the absolute maximum quantity set for the relevant lot is reached, no further delivery quantities can be demanded from the framework agreement under the conditions of this tender.
A framework contract will be concluded per lot with a supplier. There is no lot or award limitation.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Natural gas – Gasausschreibung Stadt Illertissen Lieferzeitraum 01.02.2027 - 31.12.2027
Stadt IllertissenGermanyNatural gasNo deadline givenPublished on Nov 18, 2026
Germany – Electricity – Gegenstand der Ausschreibung ist die Lieferung von Strom im Lieferjahr 2027 an die in der Leistungsbeschreibung aufgeführten Abnahmestellen des Landkreises Rhön-Grabfeld
Landkreis Rhön-Grabfeld SG Z5 BeschaffungenGermanyElectricityDeadline in 25 daysPublished on Nov 17, 2026
Germany – Natural gas – Ausschreibung Strom und Gas_KBR_2027
Klinikum Bremerhaven-Reinkenheide gGmbHGermanyNatural gasElectricityElectricity distributionDeadline in 24 daysPublished on Nov 17, 2026
Germany – Long-distance heating – Biomassekesselanlage 2x 1400 kW Leistung
Bützower Wärme GmbHGermanyLong-distance heatingDeadline in 11 daysPublished on Nov 16, 2026