Romania – Turbine works – Achiziție și montaj echipamente mecanice și electrice la CHE Nehoiașu II, extidere stație de transformare 110 kV - AHE Surduc-Siriu. Treapta Surduc-Nehoiașu-
Description
The project “Purchase and installation of mechanical and electrical equipment at CHE Nehoiașu II, extension of 110 kV substation” mainly involves work for turbines, design activities (drawing up technical documentation for mechanical equipment, electrical equipment/object), manufacturing/procurement, testing, packaging, transport, delivery as well as the installation of new equipment and systems, testing and verification, both in the factory and on site, commissioning and training of personnel. The documented procurement through this contracting strategy aims to award a "turnkey" contract, which, in addition to the activities listed above, includes work, design, installation and commissioning of mechanical and electrical equipment at the power plant, namely:
Mechanical and electrical equipment at the power plant
i)Hydro unit: Turbine and ancillary equipment, including synchronous vent, Generator, Speed regulator, Voltage regulator, Spherical valve installation, Aspirator installation, Batardou debușare canal fugă CHE Nehoiașu (Siriu Fall + Surduc Fall), Auxiliary mechanical installations, 0.4 kV installations: General services - extension, Unit's own services
ii)Automation, control and protection systems for the hydro unit and the power plant: Centralised automation system for general installations, Automation system for unit's own installations, Hydro unit automation system, Electric energy measurement system, Electrical protection system with integration into the existing protection system, Local power plant dispatcher, Diagnostic system
iii)Security assurance system: Fire detection and warning system, Integrated security system, Voice-data communication system, Installation for protection against pipe burst and supply, Installation for measuring levels, net falls and turbine operating parameters, 1000 kVA own services transformer, DC installation, Low voltage cable management and secondary circuits, Earthing installation at the power plant and at the 110 kV substation.
Primary electrical equipment: 110 kV substation - extension, 110 kV substation. Secondary switching, Capsulated bars, 63 MVA transformer, Low voltage cable management and secondary circuits.
The requirements for each Technical Unit are presented in the respective CS. These CS include the execution of all works and the provision of all materials, permanent and temporary equipment, tools, accessories for transport to the site including loading, unloading, (if necessary reloading), painting, testing, participation in technological tests and in the commissioning of all electrical and mechanical equipment and accessories necessary for the execution of the works. To fully and correctly meet the requirements of the Contract, the Contractor will satisfy all the provisions of the CS and the General Technical Conditions, in correlation with the CS requirements for electrical equipment. The volume of works is established in the General Technical Conditions pct. 1.4.1, in the general conditions of the Contract and in the CS specified at pct. 1.1.2. from CS-E+M-0. GENERAL TECHNICAL CONDITIONS. ELECTRICAL AND MECHANICAL EQUIPMENT. The Contracting Entity sets two deadlines by which it will respond (CONSOLIDATED) clearly and completely to all requests for clarification/information, as follows:
1. DEADLINES FOR CLARIFICATION REQUESTS:
a) The first deadline, 30 days before the deadline for submission of Tenders;
b) The second deadline, 20 days before the deadline for submission of Tenders.
2. DEADLINES FOR CONSOLIDATED RESPONSES:
a) 25 days before the deadline for submission of Tenders for requests from point 1, letter a;
b) 15 days before the deadline for submission of Tenders, for requests from point 1, letter b.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Romania – Overhaul and refurbishment work – Execuție lucrări pentru obiectivul ”Creșterea eficienței energetice a clădirilor rezidențiale din Municipiul Lupeni, Blocul F1, Strada Viitorului”, Cod SMIS 348067
Municipiul LupeniRomaniaOverhaul and refurbishment workBuilding installation workThermal insulation workDeadline in 22 daysPublished on Oct 22, 2026
Romania – Buildings of particular historical or architectural interest – SERVICII DE ELABORARE A PROIECTULUI TEHNIC DE EXECUȚIE (INCLUSIV FAZA DTAC), EXECUȚIE LUCRĂRI ȘI ASISTENȚĂ TEHNICĂ DIN PARTEA PROIECTANTULUI PE PARCURSUL EXECUȚIEI LUCRĂRILOR DE ”RESTAURARE, CONSOLIDARE ȘI PUNERE ÎN VALOARE A CASEI VÂRNAV-LITEANU, COD LMI SV-II-m-B-05565, CONSTRUIRE CORPURI NOI DE CLĂDIRE, AMENAJĂRI PEISAGERE, PARCARE, ÎMPREJMUIRE, BRANȘAMENTE ȘI LUCRĂRI ARHEOLOGICE, ORAȘ LITENI
MINISTERUL CULTURIIRomaniaBuildings of particular historical or architectural interestHistorical monument or memorial construction workEngineering design services for the construction of civil engineering worksDeadline in 15 daysPublished on Oct 22, 2026
Romania – Works for complete or part construction and civil engineering work – Proiectare, execuție lucrări și asistenţă tehnică din partea proiectantului pentru obiectivul de investitii: “Reparație capitală, modernizare, reabilitare termică și extindere sediul Tribunalului Sălaj și Judecătoriei Zalău”, str. Tudor Vladimirescu nr. 10, municipiul Zalău, județul Sălaj – rest de executat - 9125
COMPANIA NATIONALA DE INVESTITII SARomaniaWorks for complete or part construction and civil engineering workArchitectural, construction, engineering and inspection servicesTechnical assistance servicesDeadline in 25 daysPublished on Oct 22, 2026
Romania – Solar panel roof-covering work – Servicii elaborare proiect tehnic, DTAC, detalii de execuție, asistența tehnica proiectant, verificare tehnică si execuție lucrari pentru obiectivul de investiții «INFRASTRUCTURA DE PRODUCERE A ENERGIEI REGENERABILE PENTRU SPITALUL MUNICIPAL ANTON CINCU TECUCI»
JUDETUL GALATIRomaniaSolar panel roof-covering workSolar photovoltaic modulesElectrical installation workDeadline in 22 daysPublished on Oct 22, 2026