Poland – Solar photovoltaic modules – Budowa elektrowni fotowoltaicznej wraz z magazynem energii na terenie zajezdni autobusowej w Sosnowcu przy ulicy Lenartowicza 73
Description
1. The subject of the contract is the construction of a photovoltaic power plant with an energy storage system on the premises of the bus depot in Sosnowiec at Lenartowicza 73. 2. The subject of the contract includes: 1) design – preparation of comprehensive documentation in accordance with building regulations and technical knowledge, complete design documentation for the investment project entitled: "Construction of a photovoltaic power plant ~ 600 kWp with accompanying infrastructure, including an energy storage system with a minimum capacity of 2000 kWh" located on land plots no. 3460; 1956/3; 1955/21, 2006/23; 1955/6; 1955/7; 1955/8; 1955/9; 1955/10; 1955/11; 1955/12; 1955/13, located in the province of Śląskie, Sosnowiec district, Sosnowiec city municipality, cadastral area 0003 (Zagórze). The final location of the power plant and the energy storage system within these plots must be agreed with the Contracting Authority. At the design stage, the necessary approvals from OSD Tauron, the City Office, and a building permit application (PZT, PAB) must be obtained, a valid building permit from the City Office in Sosnowiec, and the necessary agreements, including with the Fire Department, at a coordination meeting for new cable routes, and parallel to the start of the construction of the facility, agree with OSD Tauron Dystrybucja S.A. (hereinafter referred to as "OSD" or "Tauron") the technical solution and method of connection to the public grid (technical design) and the rest for the designed facility. The Contracting Authority expects the Contractor to provide complete design documentation enabling the start of construction and its completion (agreed technical design); 2) construction / building works (assembly) – carried out on the basis of the approved design documentation by the Contracting Authority and the City Office in Sosnowiec (building, installation and assembly works consisting of the installation of a photovoltaic power plant with a capacity of up to 600 kWp on ground structures along with the necessary accompanying infrastructure, including an energy storage system with a minimum capacity of 2000 kWh, in the scope provided for in the design documentation, along with: commissioning, testing, and performing control measurements in accordance with the scope of assembly works). The Contracting Authority expects the Contractor to build and hand over the building for use, along with obtaining all approvals or re-agreeing them for the final accepted technical solution. The subject of the contract also includes preparatory works for the area covered by the planned project, including the removal of concrete slabs, unless the Contracting Authority indicates otherwise; 3) author's supervision – performing author's supervision by the designer / designers during the investment period in the scope provided for in art. 20, para. 1 point 4 of the Building Law (i.e. Journal of Laws of 2026, item 524 as amended). 3. The main goal of implementing the subject investment is to provide an alternative source of electrical energy for charging electric buses. The chargers for charging electric buses are powered by a two-container transformer station marked on the situational plan with the symbol ST-2. 5. A detailed description of the subject of the contract as well as the description of the method of execution is in Section III of the SWZ, the Functional-User Program (PFU), which is Annex No. 6 to the SWZ and PPU, which is Annex No. 3 to the SWZ.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Solar photovoltaic modules – Zielona energia – Budowa instalacji OZE w Gminie Bieruń
Gmina Bieruń reprezentowana przez Burmistrza Miasta BieruniaPolandSolar photovoltaic modulesSolar installationPower convertersDeadline in 17 daysPublished on Nov 22, 2026
Poland – Solar photovoltaic modules – Zwiększenie produkcji energii ze źródeł odnawialnych na terenie Miasta Brzeziny – Etap III.
MIASTO BRZEZINYPolandSolar photovoltaic modulesArchitectural design servicesEngineering design servicesDeadline in 8 daysPublished on Nov 22, 2026
Poland – Radio-isotopes – Dostawa produktów radiofarmaceutycznych
Narodowy Instytut Onkologii im. Marii Skłodowskiej-Curie - Państwowy Instytut BadawczyPolandRadio-isotopesVarious medicinal productsDeadline in 29 daysPublished on Nov 22, 2026
Poland – Petroleum products, fuel, electricity and other sources of energy – Dostawa energii elektrycznej na potrzeby budynków i lokali biurowych, oświetlenia drogowego oraz urządzeń komunalnych gminy Bolesławiec
Gmina BolesławiecPolandPetroleum products, fuel, electricity and other sources of energyElectricity, heating, solar and nuclear energyDeadline in 14 daysPublished on Nov 22, 2026