Skip to content
Back to search

Germany – Engineering services – Sanierung und Erweiterung des 3.+ 4. BA an der Klinik Eichstätt – Leistungen der Technischen Ausrüstung, Anlagengruppen 4, 5 und 6‚ gemäß §§ 53 ff. HOAI LPH 1-3 + 5-9

Kliniken im Naturpark Altmühltal AdöRGermanyPublished on Jul 02, 2026
No deadline given

Description

The District Office of Eichstätt intends to renovate the House of the Clinics in the Altmühltal Nature Park in Eichstätt in the 3rd and 4th construction phases. The Clinics in the Altmühltal Nature Park GmbH comprises two hospitals for basic and standard care at the locations of Kösching and Eichstätt. In the disciplines of Internal Medicine, Surgery, Orthopaedics, Gynaecology, Urology, Ophthalmology and Otorhinolaryngology, approximately 45,000 patients are treated annually at both locations. Meanwhile, the medical and nursing needs in the region have changed significantly. The provider is therefore obliged to adapt the structures and medical services to the challenges of current developments. Fundamental structural adjustments are required in terms of today's economic and functional requirements. The Eichstätt Clinic is undergoing a continuous general renovation with several construction phases, currently in the second construction phase. The existing structure is characterised by structural limitations and a reduced bed capacity, while at the same time an increasing supply demand is forecast due to performance shifts and demographic development. The aim is to expand to a total of 172 beds and to functionally reorganise central areas. The third construction phase represents the decisive development step and focuses on the targeted functional and spatial expansion of the clinic site. The core measure is the creation of additional nursing capacities through extension buildings to structurally implement the planned increase in beds. A particular focus is on the implementation of an independent geriatric unit and further ward areas that meet future medical requirements. In addition, the Central Elective Admission (ZEA) will be realised in the 3rd construction phase, which serves as a structured and efficient point of contact for elective patients and bundles central processes. In addition, service and supply areas, especially for staff and visitors, will be reorganised and expanded. To ensure the ongoing clinic operation during the construction phase, a relief building will be erected in advance, which temporarily takes over nursing capacities and functional rooms and is perspectively integrated permanently for outpatient and supplementary uses. The fourth construction phase primarily involves the reorganisation of central functional areas in the entrance and outpatient area, in particular with the main entrance, cafeteria, hospital management and service, social and treatment areas. Furthermore, BA 4 includes essential medical structures such as central admission, medical service, endoscopy and supporting treatment, which are functionally combined and expanded. Overall, BA 4 thus serves to strengthen the central patient areas and the organisational core functions of the clinic operation while simultaneously reorganising the space. The total costs of the overall project BA3+4 (KG 200-600) are estimated at approximately 45.0 million € gross and are divided as follows: - KG 200 0.25 million € - KG 300 27.7 million € - KG 400 15.5 million € - KG 500 0.60 million € - KG 600 1.03 million € The following areas are planned 3rd BA 2,988.50 m² NUF 4th BA 2,920.50 m² NUF The project's key milestones for implementation are: - Start of performance: Oct 2026 - Application for advance determination: 1st quarter 2027 - Start of construction: 1st quarter 2030 - Completion: 3rd BA - 3rd quarter 2033 4th BA - 3rd quarter 2036 Planning services are to begin immediately after the order. It is intended to award the following services (step-by-step and construction phase-by-phase) with this tender: Services of the Technical Equipment, Equipment Groups 4, 5 and 6, according to §§ 53 ff. HOAI LPH 1-3 + 5-9. The services will be awarded step-by-step and construction phase-by-phase. Initially, in the 1st awarding stage BA 3, the performance phase 1+2 according to HOAI will be awarded. The performance phases 3 +5-9 will be called up step-by-step and construction phase-by-phase. There is no legal claim to the overall award.

CPV codes

Engineering servicesElectrotechnical equipment

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders